32261-5-0414
Page 9
FBB10 BLOWER KIT INSTALLATION (OPTIONAL)
BENCH INSTALLATION (BEFORE INSTALLED IN WALL)
1. With Power completely turned off, Remove plate and four
screws from right panel.
See Figure 1.
Figure 1
2. Install the blower onto the prebent brackets on the blower
plate. Ensure the Velcro connects to secure the blower in
place.
See Figure 2.
Figure 2
3. Route wiring through opening.
4. Secure blower assembly into place per step 2 with velcro.
5. Install thermo disc by snapping into valve bracket
burner assembly.
See Figure 3.
Figure 3
6. Connect Power source into outlet.
BLOWER INSTALLATION
(AFTER INSTALLED IN WALL)
1. Make sure power is turned off prior to any removal. Lift and
pull panel to remove from bottom assembly.
See Figure 4.
Figure 4
2. Undo two latches at bottom of firebox assembly.
See Figure
5.
Figure 5
Содержание DVCC32LP
Страница 39: ...32261 5 0414 Page 39 Figure 77 MILLIVOLT STANDING PILOT WIRING DIAGRAM BP3 SERIES ...
Страница 46: ...32261 5 0414 Page 46 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING BP7 SERIES ...
Страница 47: ...32261 5 0414 Page 47 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING BP7 SERIES ...
Страница 51: ...32261 5 0414 Page 51 MILLIVOLT PARTS VIEW DVCP 32 36 42 BP3 ...
Страница 53: ...32261 5 0414 Page 53 IP PARTS VIEW DVCP 32 36 42 BP7 ...