9

2. Battery Charging during Sunshine

PV System Interconnection

PV Module to DC/AC DB

 

Switch OFF ALL MCBs

 

 Switch ON the inverter MBC MCB (It will show in the display , MMPT –OFF, INV-ON,GRID-OFF,  
Load- OFF)

 DC/AC DB to PCU 

 

 Switch ON the ARRAY MCB in the DC side (It will show in the display , MMPT –ON, INV-ON, 
GRID-OFF, Load- OFF)

 PCU to Load  

 

 Switch ON the AC MCB in the AC side ( It will show in the display , MMPT –ON, INV-ON,GRID-OFF,  
Load- ON

Содержание Power Pack Systems

Страница 1: ...your electricity with EMMVEE Power Pack Systems OWN...

Страница 2: ...Solar PV System Single Line Diagram 3 Installation of Solar PV System 4 PV Module Interconnection 5 DC AC Distribution Box 6 Battery Bank 7 PV System Interconnection 9 Commissioning of System 10 Check...

Страница 3: ...ected in series electrically Array Several strings of PV modules connected in parallels Insolation Is a measure of solar radiation energy received on a given surface area measured in kWh m day STC Sta...

Страница 4: ...the site of customer as per the details in the Pre installation survey report prepared after site visit and the terms contained in the work order issued by the customer The system installed should com...

Страница 5: ...al proceedings relating to the matter shall be instituted in the Court within whose jurisdiction the power plant is presently proposed to be located IN WITNESS whereof the parties hereto have caused t...

Страница 6: ...material please specify 14 Pre installation site photograph of the place where the solar modules array is proposed to be installed to be attached as Annexure 1 and emailed to the concerned district o...

Страница 7: ...tem 34 Additional cost of the structure If required 35 Additional cost of the wiring If required 36 Total cost of the installation 37 Date of completion of installation proposed Enclosures 1 Pre insta...

Страница 8: ...Bank Flooded type lead acid tubular battery 12 V 150 Ah Southern EXIDE HBL 4 No s 4 Wooden Battery stand Standard 1 Set 5 PV Array support structure MS Galvanized Emmvee 1 Set 6 Cable Multistrand Copp...

Страница 9: ...required by MNRE for rooftop off grid programme and fixed by ANERT for 10000 rooftop off grid programme 4 Cost for standard installation 5 Cost of additional requirements such as customization of stru...

Страница 10: ...nk 12 Make of the Battery 13 Sl no s of the battery installed 14 Make of the PCU 15 Capacity of the PCU 16 Sl no of PCU installed 17 Invoice Bill no 18 Invoice amount 19 Date of completion of installa...

Страница 11: ...olar power plant from the list of agencies empanelled by ANERT as per my choice and any dispute regarding installation payment and warranty shall be sorted out between me and the Agency that installed...

Страница 12: ...of the agency 13 1 International Airport Road Bettahalasur post Bengaluru 562 157 India Bank details Name and address of the Bank IFS code of the Bank I Name registration no have installed a 1 kW sol...

Страница 13: ...me of person who conducted the inspection 4 Remarks after inspection Installation is satisfactory Not satisfactory Recommended for release of subsidy payment Signature of the district engineer Date Na...

Страница 14: ...Charge Controller Technology MPPT Maximum Power Point Tracking PV Protection Reverse flow Protection from Battery to PV Module Electronic Protection for Low battery Short circuit Over Load Protection...

Страница 15: ...3 Solar PV System Single Line Diagram...

Страница 16: ...4 Installation of Solar PV System...

Страница 17: ...ted to track the sun either automatically or manually In most cases the mounting is fixed at one angle a right angle to the sun at noon but can be adjusted according to the season Select a site where...

Страница 18: ...oposed DC section AC section the schematic diagram of DC AC DB is as below DC AC DISTRIBUTION BOX Note The DC AC DB shall be mounted on a vertical wall at a convenient height 1 2 mtr above floor level...

Страница 19: ...7 Battery Bank The battery need to be installed in a well ventilated place on a wooden stand supplied Handling battery are interconnected as below for 24V system Reference Connection Details...

Страница 20: ...8 1 Battery using Instruction Safety...

Страница 21: ...ON the inverter MBC MCB It will show in the display MMPT OFF INV ON GRID OFF Load OFF DC AC DB to PCU Switch ON the ARRAY MCB in the DC side It will show in the display MMPT ON INV ON GRID OFF Load O...

Страница 22: ...O Remarks 1 Module Cleaned N A 2 Wire tightened at Module junction box N A 3 Tilt Orientation of Module N A 4 Tightness of module bolts nuts N A 5 Whether the module place is shadow free from 8 AM to...

Страница 23: ...s under STC 4 5 Warranty valid up to 5 Details of the Phovoltaic Module s supplied in the system 5 1 Make Name of the Manufacturer Emmvee Photovoltaic Power Private Limited 5 2 Model 5 3 Batch Serial...

Страница 24: ...Phone 91 80 4323 3511 Fax 91 80 2846 7801 Email info emmvee in Website www emmvee com Service Record Sl No Date of problem reporting Date of service Preventive maintenance visit Yes No Details of repa...

Страница 25: ...plant 13 1 International Airport Road Bettahalasur Post Bengaluru 5621 157 India Phone 91 80 4323 3544 info emmvee in EMMVEE Photovoltaic Power Private Limited Branch Office 17 39A Elavoor Kavala Karu...

Отзывы: