3 – 7
VSS/VSR/VSM/VSH/VSSH Compressor • Installation, Operation and Service Manual • Emerson • 35391S
Long Term Storage Log
Company:
Sales Order Number:
Serial Number:
Name (Please Print):
Initial:
Date (M/D/Y):
PSI Nitrogen Pressure - Current
PSI Nitrogen Pressure - Recharged (If pressure is low, identify and fix leak prior to recharging, see Compressor Unit Leak Check
procedure in Section 5)
Nitrogen Leak Location (Briefly explain nature of leak):
Compressor Shaft (Rotate shafts at least 6 revolutions)
Motor Shaft (Rotate shafts at least 6 revolutions)
Motor Bearings Greased
Air Cooled Oil Cooler Rotated (If equipped)
Bare Metal Surfaces (Check all bare metal surfaces for rust and ensure they are covered with rust inhibitor)
Desiccants (Are desiccants still effective? If not, replace. Check control panel, motor, pneumatic controllers and valves)
Cover Bags/Tarp (Ensure bags and tarps are not torn and are sealed over components correctly, replace if damaged)
Valves (Stop valves are in closed position so the compressor unit is isolated. All other valves, except those venting and draining to atmo-
sphere are to be open)
Space Heater & Panel Components (Ensure space heater is energized and panel components are rust-free)
Name (Please Print):
Initial:
Date (M/D/Y):
PSI Nitrogen Pressure - Current
PSI Nitrogen Pressure - Recharged (If pressure is low, identify and fix leak prior to recharging, see Compressor Unit Leak Check
procedure in Section 5)
Nitrogen Leak Location (Briefly explain nature of leak):
Compressor Shaft (Rotate shafts at least 6 revolutions)
Motor Shaft (Rotate shafts at least 6 revolutions)
Motor Bearings Greased
Air Cooled Oil Cooler Rotated (If equipped)
Bare Metal Surfaces (Check all bare metal surfaces for rust and ensure they are covered with rust inhibitor)
Desiccants (Are desiccants still effective? If not, replace. Check control panel, motor, pneumatic controllers and valves)
Cover Bags/Tarp (Ensure bags and tarps are not torn and are sealed over components correctly, replace if damaged)
Valves (Stop valves are in closed position so the compressor unit is isolated. All other valves, except those venting and draining to atmo-
sphere are to be open)
Space Heater & Panel Components (Ensure space heater is energized and panel components are rust-free)
Содержание Vilter VSH
Страница 1: ...VSS VSR VSM VSH VSSH Installation Operation and Service Manual Single Screw Bare Shaft Compressor ...
Страница 2: ......
Страница 16: ...1 4 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 54: ...4 18 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 102: ...5 48 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 114: ...7 4 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 116: ...8 2 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 144: ...8 30 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 162: ...8 48 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 164: ...A 2 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 168: ...B 4 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 174: ...C 6 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 177: ......
Страница 179: ......
Страница 182: ......
Страница 183: ......
Страница 184: ......
Страница 200: ...E 12 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 204: ...F 4 Blank VSS VSR VSM VSH VSSH Compressor Installation Operation and Service Manual Emerson 35391S ...
Страница 205: ......