Contents
2.1 Installing the Rosemount Model 500 helium to hydrogen gas conversion kit....................................9
2.2 Installing the carrier shut-off valve and pressure regulator..............................................................10
2.3 Installing the new 10-ft. (3 m) long reference detector restrictor (R2)............................................ 12
2.4 Purging the carrier gas lines............................................................................................................13
2.5 Changing the thermistors...............................................................................................................14
2.6 Adjusting the carrier pressure.........................................................................................................16
Retrofit Instructions
Contents
SK-07781
September 2019
Rosemount Model 500 Helium to Hydrogen Gas Conversion Kit
v
Содержание Rosemount Model 500
Страница 4: ...4 ...
Страница 6: ...Contents Retrofit Instructions September 2019 SK 07781 vi Emerson com Rosemount ...
Страница 8: ...Safety requirements Retrofit Instructions September 2019 SK 07781 8 Emerson com Rosemount ...
Страница 22: ...Installation Retrofit Instructions September 2019 SK 07781 22 Emerson com Rosemount ...