Reference Manual
00809-0100-4302, Rev BA
January 2008
5-9
Rosemount 1153 Series B
POST-ASSEMBLY TESTS
1.
Conduct hydrostatic testing to 150% of maximum working pressure or
2,000 psi, whichever is greater.
2.
Calibrate the transmitter per the calibration section of this manual.
3.
Conduct nuclear cleaning to 1 ppm chloride content of transmitter
“wetted parts.”
ITEM(S) TO BE TORQUED
TORQUE VALUE
TOLERANCE
Bracket to Mounting Panel Bolts
16.5 ft-lb (22.4 N-m)
±1 ft-lb (1 N-m)
Transmitter to Bracket Bolts
21 ft-lb (29 N-m)
±1 ft-lb (1 N-m)
Swagelok Process Fittings
See Installation Instructions
-
Drain/Vent Valves
7.5 ft-lb (10 N-m)
±0.5 ft-lb (0.7 N-m)
Covers
16.5 ft-lb (22.4 N-m)
±1 ft-lb (1 N-m)
Module Neck Lock Nut
35 ft-lb (48 N-m)
±1 ft-lb (1 N-m)
Conduit Fitting
4 to 7 turns or a minimum of 12.5 ft-lb (16.9 N-m)
±1 ft-lb (1 N-m)
Flange Bolts
See Process Flange Reassembly
-
Terminal Block Screws
5 in-lb (0.6 N-m) or hand tight
±1 in-lb (0.1 N-m)
Amplifier Board Screws
Nominal 10 in-lb (1.1 N-m)
-
Содержание Rosemount 1153 Series B
Страница 6: ...Reference Manual 00809 0100 4302 Rev BA January 2008 Rosemount 1153 Series B iv ...
Страница 9: ...Reference Manual 00809 0100 4302 Rev BA January 2008 TOC 3 Rosemount 1153 Series B ...
Страница 10: ...Reference Manual 00809 0100 4302 Rev BA January 2008 Rosemount 1153 Series B TOC 4 ...
Страница 12: ...Reference Manual 00809 0100 4302 Rev BA January 2008 Rosemount 1153 Series B 1 2 ...
Страница 50: ...Reference Manual 00809 0100 4302 Rev BA January 2008 Rosemount 1153 Series B 5 12 ...
Страница 62: ...Reference Manual 00809 0100 4302 Rev BA January 2008 Rosemount 1153 Series B Index 2 ...
Страница 63: ......