Termination resistance for the Receive Data (RD) signal must be connected only on units at
the ends of lines. This termination is made at the CPU by connecting a jumper between pin
9 and pin 10 inside the D-shell connector. Ground Potential: Multiple units not connected
to the same power source must have common ground potential or ground isolation for
proper operation of the system.
4.8
Ethernet Connection for CPUE05
The Ethernet port on PLC module IC200CPUE05 connects directly to a
10BaseT (twisted pair shielded) network without an external transceiver. Connect the port
to an external 10BaseT hub or switch or a hub or repeater with auto- sense of 10/100 using
a twisted pair cable. Cables are readily available from commercial distributors. Emerson
recommends purchasing rather than making cables. Your 10BaseT twisted pair shielded
cables must meet the applicable IEEE 802 standards.
4.8.1
Network Connection
Connection of the CPUE05 to a 10BaseT network is shown below:
Figure 41
Содержание PaCSystems VersaMax Series
Страница 1: ...User Manual GFK 1503F Jan 2020 PACSystemsTM VersaMax PLC USER MANUAL ...
Страница 85: ...User Manual Chapter 7 GFK 1503F Jan 2020 CPU Operation 71 7 1 Parts of the CPU Sweep Figure 47 ...
Страница 284: ...User Manual Chapter 14 GFK 1503F Jan 2020 PID Built in Function Block 270 Figure 216 ...