This chapter gives you information about the:
z
Power-up procedure
z
Switches and indicators
2.2
Applying Power
After you verify that all necessary hardware preparation is complete and all connections are
made correctly, you can apply power to the system.
When you are ready to apply power to the MVME6100:
z
Verify that the chassis power supply voltage setting matches the voltage present in the
country of use (if the power supply in your system is not auto-sensing)
z
On powering up, the MVME6100 brings up the MOTLoad prompt,
MVME6100>
2.3
Switches and Indicators
The MVME6100 board provides a single pushbutton switch that provides both abort and reset
(ABT/RST) functions. When the switch is depressed for less than three seconds, an abort
interrupt is generated to the processor. If the switch is held for more than three seconds, a
board hard reset is generated. The board hard reset will reset the MPC7457, MV64360, Tsi148
VME Bridge ASIC, PCI6520, PMC1/2 slots, both Ethernet PHYs, serial ports, PMCspan slot, both
flash banks, and the device bus control PLD. If the MVME6100 is enabled for VME system
controller, the VME bus will be reset and local reset input is sent to the Tsi148 VME controller.
The MVME6100 has two front-panel indicators:
z
BDFAIL, software controlled and asserted by firmware (or other software) to indicate a
configuration problem (or other failure)
z
CPU, connected to a CPU bus control signal to indicate bus transfer activity
Содержание MVME6100 Series
Страница 10: ...MVME6100 Single Board Computer Installation and Use 6806800D58E 10 List of Figures ...
Страница 58: ...MOTLoad Firmware MVME6100 Single Board Computer Installation and Use 6806800D58E 58 ...
Страница 114: ...Thermal Validation MVME6100 Single Board Computer Installation and Use 6806800D58E 114 ...
Страница 117: ......