16
Reference Manual
24625020, Rev AA
March 2017
Figure 2-4. Electrode Fitting
A. Mobrey Series III Electrode.
C. Horizontal pipe run.
B. Installed base plate of insert cover.
D. Vertical pipe run.
See
“Fitting the electrode” on page 15
for the recommended tightening procedure.
2.2.4
Fitting the electrode-insert cover (part two)
This is the final part of the electrode installation procedure.
Part two of the cover fitting procedure
1.
Fit the cylindrical housing, positioning the cable gland downwards for horizontal
pipes and as close as possible to downwards for vertical pipes.
(see
2.
Fit the top plate and two stud bolts and secure the plate with the two knurled nuts
and washers (see
).
Even if the electrode cable is soon to be connected, it is advisable to complete the
installation of the cover rather than leave the electrode exposed to possible damage.
The cover should be removed just prior to fitting the cable and then re-fitted
immediately afterwards.
D
C
B
A
Содержание Mobrey Hydratect 2462
Страница 1: ...Reference Manual 24625020 Rev AA March 2017 Mobrey Hydratect 2462 Steam Water Detection System ...
Страница 2: ......
Страница 16: ...10 Reference Manual 24625020 Rev AA Introduction March 2017 Introduction ...
Страница 26: ...20 Reference Manual 24625020 Rev AA Installing the electrodes March 2017 Installing the electrodes ...
Страница 52: ...46 Reference Manual 24625020 Rev AA System Testing March 2017 System Testing ...
Страница 62: ...56 Reference Manual 24625020 Rev AA Electronics Servicing March 2017 Electronics Servicing ...
Страница 65: ......