Battery Installation
Liebert
®
APM
™
54
Figure 40 Battery cabinet connection to Liebert APM
Table 9
Control wiring for Liebert APM to battery cabinet
From
To
Liebert APM UPS Bypass
Module (X2 J4 & J8)
Battery Cabinet
Terminal Strip (TB1)
J4-2
TB1-12
J4-3
TB1-11
J4-4
TB1-10
J8-1
TB1-6
J8-2
TB1-7
J8-3
TB1-8
J8-4
TB1-9
1. All service and initial connectino of batteries
must be performed by properly trained and
qualified service personnel.
2. The Jumper X107 must short circuit Pin 1 and Pin 2.
External
Connections
AC 120V Power
to Optional BDSi
Controller
AC 120V
from UPS
BDSi Fuse Block
GRD
Fault CT
Positive
Negative
Neutral
Ground W24
W21
W22
W23
Neg. Mid Pt.
Aux.
MX
See
Note 3
Blue (Not Used)
Orange
Black
Black
Blue Com
Blue
TB1
W/R
W/Blk
White
White
Violet NO
1
2
3
4
5
6
7
8
9
10
11
12
Red
Red
White
White
Grn
Grn
Wht
Wht
Brn
Brn
Blk
Blk
Blk
Blk
1
2
3
4
1
2
3
4
X2 J8
X2 J4
X108
X105
X102
X100
X107
X101
X104
X103
X106
UHR93S6A1
X2
BCB_IN
BAT-OUT
BAT IN
GND
GND
Driver
Online
+12V
Red
Red
White
White
Wht
Grn
Brn
Blk
Blk
Blk
Red
Blk
1
2
3
3
2
1
DRV
AUX
GND1
USE
TEMP
J2
J3
J4
220VDC
220VDC
Red
Blk
UH8351A8
BIB
BCB
Control
Board
Red
3. The auxilliary blue wire is not used. Cap and coil the
wire and tie it to the bridge lance on the frame below
the breaker.
4. Shunt trip drive is 220VDC @ 2.4A.
UAM04000
Rev. 0
TB2
Brown
Yel/Grn
UPS
Module