background image

 ©Emerson Process Management Regulator Technologies, Inc., 2013; All Rights Reserved

The Emerson logo is a trademark and service mark of Emerson Electric Co. All other marks are the property of their prospective owners. Fisher is a mark owned by Fisher Controls International LLC, 

a business of Emerson Process Management.

The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or 

guarantees, express or implied, regarding the products or services described herein or their use or applicability. We reserve the right to modify or improve the designs or specifications of such 

products at any time without notice.

Emerson Process Management Regulator Technologies, Inc. does not assume responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use and 

maintenance of any Emerson Process Management Regulator Technologies, Inc. product remains solely with the purchaser.

LP-Gas Equipment

Emerson Process Management 

Regulator Technologies, Inc.

    

    

    

    

    

    

USA - Headquarters
McKinney, Texas 75069-1872, USA
Tel: +1 800 558 5853
Outside U.S.: +1 972 548 3574

    

    

    

    

    

    

Asia Pacific - Headquarters

Singapore 12841
Tel: +65 6777 8211

For further information visit www.fisherregulators.com

HSRL Series

Содержание Fisher HSRL Series

Страница 1: ...standards and regulations of the LP Gas industry should install and service this equipment Things to tell the gas customer 1 Show the customer the vent or vent assembly or vent tube Stress that this opening must remain unobstructed at all times Tell the customer to check the vent opening after a freezing rain sleet storm or snow to make sure ice has not formed in the vent 2 Show the customer the s...

Страница 2: ...mate Weight 5 5 pounds 2 5 kg 1 The pressure temperature limits in this Instruction Manual or any applicable standard limitation should not be exceeded Orifice Size Wide Open Cg FOR RELIEF SIZING MAXIMUM OPERATING INLET PRESSURE TO OBTAIN GOOD REGULATING PERFORMANCE Inch mm psig bar 3 8 9 5 105 30 2 1 1 2 13 185 20 1 4 Table 1 Maximum Operating Inlet Pressure Table 2 Relief Performance Orifice siz...

Страница 3: ...scharge to the atmosphere through the vent An obstructed vent which limits air or gas flow can cause abnormally high pressure that could result in personal injury or property damage Failure to use a vent line on Indoor Installations can cause a hazardous accumulation of gas which could result in personal injury or property damage General Installation Instructions Before installing the regulator Ch...

Страница 4: ...ugh above ground level at least 18 inches 45 cm so that rain splatter cannot freeze in the vent Regulators Subjected to Heavy Snow Conditions Some installations such as in areas with heavy snowfall may require a hood or enclosure to protect the regulator from snow load and vent freeze over Horizontally Installed Regulators Horizontally mounted regulators such as found in single cylinder installati...

Страница 5: ... Series Figure 4 Basement Installation TO APPLIANCE VENT ASSEMBLY VENT OPENING MUST BE AT LEAST 3 FEET 0 91 meter HORIZONTALLY FROM ANY BUILDING OPENING BELOW IT VENT LINE BASEMENT FROM FIRST STAGE REGULATOR ...

Страница 6: ... wear or damage that may occur from external sources these regulators must be inspected and maintained periodically The frequency of inspection and replacement of the from the regulator s internal relief valve Vent lines should be at least 3 4 inch NPT pipe or 3 4 inch NPT size Gray PVC Schedule 40 Rigid Non metallic Electrical Conduit for above Ground Service per Underwriters Laboratories UL 651 ...

Страница 7: ...derground systems and in areas that are subject to sea salt coastal atmospheres should be inspected annually for external and internal corrosion and may require replacement sooner Refer to Fisher Bulletin LP 32 for additional information Water inside Regulators from Floods or Weather Replace any regulator that has been flooded has had water in the spring case or shows evidence of external or inter...

Страница 8: ... services described herein or their use or applicability We reserve the right to modify or improve the designs or specifications of such products at any time without notice Emerson Process Management Regulator Technologies Inc does not assume responsibility for the selection use or maintenance of any product Responsibility for proper selection use and maintenance of any Emerson Process Management ...

Отзывы: