Chapter 3 Mechanical Installation 21
Liebert.CRV+ Series Air Cooled Precision Air Conditioner User Manual
Table 3-11 Refrigeration oil adding amount
Refrigeration oil adding amount with different pipe length (length unit: mm, refrigeration oil unit: ml)
Liquid pipe
OD (mm)
CR025
10
20
30
35
40
45
50
12.7
Refrigeration oil charging is not needed
Refrigeration oil charging is not needed
32
16
11
19
28
37
19
35
48
60
72
Liquid pipe
OD (mm)
CR035
10
20
30
35
40
45
50
16
Refrigeration oil charging is not needed
Refrigeration oil charging is not needed
13
19
12
24
37
49
22
39
55
71
87
Table 3-12 Types of refrigeration oil
Unit model
Types of refrigeration oil
CR025
POE
CR035
PVE
3.5 Removing Transportation Fastener And Vibration Absorber
To protect partial components from damaging and distorting due to bumping, impact and resonation, fasteners and
vibration absorbers are mounted at certain locations before delivery. Remove the fasteners and vibration absorbers
before installation and commissioning.
Removing pipe fixity
To prevent long copper pipe from getting close to metal plate and thus causing wearing and crack of the copper pipe,
vibration absorbing foams are fitted between them. Remove these objects and do cleaning before installation and
commissioning.
Removing limiting piece of electrical control box
To prevent the electrical control box from moving during transportation, a limiting piece of electrical control box is
installed before delivery. You need to remove the limiting piece before operating the unit, so you can slide out the
electrical control box during maintenance.
Adjusting wind-leading grill
According to the installation location of the Liebert.CRV+ air conditioner, you can adjust the installing direction of the
wind-leading grill, making it lead wind to left or right. The wind-leading grill is composed of several pieces. Remove
the screws on both sides of single piece of wind-leading grill, rotate it 180 degree, and install it back to change the
wind direction. The mounting screws of single piece of wind-leading grill are shown in Figure 3-21.
M4 screw
(6 pcs)
Figure 3-21 Fixing mode of wind-leading grill
Sealing the holes of the top plate of the cabinet
For smooth installation on site and connection of the rack on the top of the machine room, there are some holes
reserved on the top of the cabinet. After the cabinet is installed on the site, rubber plugs and blots are needed to seal