Cabling and connecting
47
Helios Candeo Power System
– AP6C75AA Installation Manual
Figure 4.2 – Typical installation of the power system frame ground lead
BPG or FGB
NT6C75AA
Helios Candeo
power system
framework
Battery stand,
rack or stack
FG - 6 AWG
Collector cable –
sized per note 1
and Table 4.6
FG – sized per note
2 and Table 4.6
BPG or FGB
NT6C75AA
Helios Candeo
power system
framework
FG - sized per
Table 4.6
or
Figure 4.3 – Connection of the frame ground lead inside the frame
Holes for
1/4” bolts
at 5/8” c-c
Holes for
3/8” bolts
at 1” c-c
Holes for
1/2” bolts at
1-3/4” c-c
Содержание ASTEC Helios Candeo AP6C75AA
Страница 2: ......
Страница 4: ......
Страница 12: ...12 Contents IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Страница 72: ...72 Cabling and connecting IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Страница 84: ...84 Appendix A Drawings IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Страница 95: ......