INSTALLATION

(continued)

1---2

De–energize the conductors before making any

line or auxiliary circuitry connections. Be sure

that Normal and Emergency line connections

are in proper phase rotation. Place engine gen-

erator starting control in the OFF position. Make

sure engine generator is not in operation.

Testing Power Conductors

Do not connect the power conductors to the ACTB until
they are tested. Installing power cables in conduit, cable
troughs, and ceiling-suspended hangers often requires
considerable force. The pulling of cables can damage
insulation and stretch or break the conductor’s strands.
For this reason, after the cables are pulled into position,
and before they are connected they should be tested to
verify that they are not defective or have been damaged
during installation.

Protect the switch from construction grit

and metal chips to prevent malfunction or

shortened life of the ACTB switch.

Connecting Power Conductors

A

Wiring Diagram

is furnished with the ACTB. All wiring

must be made in accordance with the local codes. After
the power cables have been tested, connect them to the
appropriate terminal lugs on the Bypass Switch as shown
on the wiring diagram provided with this ACTB. Make
sure that the lugs provided are suitable for use with the
cables being installed.

Standard terminal lugs are

solderless screw type and will accept the wire sizes listed
on the drawings provided with the ACTB. Be careful
when stripping insulation from conductors; avoid nicking
or ringing the conductor. Remove surface oxides from
conductors by cleaning with a wire brush.

Follow

conductor manufacturer’s instructions when aluminum
conductor is used. Apply joint compound to conductor,
then carefully wipe away excess compound. Tighten the
cable lugs to the torque specified on the rating label.

Be sure that the Normal and Emergency power

connections are in proper phase rotation.

Bus Connections

If bus connection is used, use SAE grade 5 hardware to
connect bus to appropriate terminal plates on bypass
switching device. Wipe off bus surfaces before they are
joined. If bus is dirty, gently clean surfaces with a
non-flammable solvent. Avoid touching cleaned surfaces.

Do not breathe cleaning solvent vapors.

Use SAE grade 5 hardware and tighten the bolted joints
to the torque specified in Table 2-1.

The reliability of the connection depends

on how clean and how tight the joint is.

Table 2-1. Tightening torque values for bolted joints.

Bolt Diameter

(Grade 5 hardware)

in inches

Recommended

Tightening Torque

in foot pounds

5/16

12

3/8

20

1/2

50

5/8

95

Harnesses

All internal connections are made at the factory. The
bypass switch, transfer switch, and control panel are
joined together by an interconnecting wire harness. The
disconnect plugs are already engaged on enclosed
switches. For open–type switches, the plugs must be
engaged after installation is completed. Align harness
plugs with sockets in the control and push them together
until they are secure.

Controller Ground

A grounding wire must be connected to the controller’s
lower left mounting stud. Because the controller is
mounted on the enclosure door, a conductive strap must
be used between the enclosure and the door. This
connection provides proper grounding which does not
rely upon the door hinges.

Engine Starting Contacts

and Auxiliary Circuits

The engine control contact signal connections and
auxiliary circuits are located on terminal block TB as
shown on the

Wiring Diagram

provided with the ACTB.

Connect the signal wires to the appropriate terminals.

Содержание ASCO 7000 Series

Страница 1: ...ies ACTB for all installation and connection details and accessories Refer to Group 5 Controller User s Guide 381333 126 for ATS status display messages time delays pickup dropout settings and adjustments An experienced licensed electrician must install the 7ACTB Rating Label Each 7000 Series 7ACTB contains a rating label to define the load and fault circuit withstand closing ratings Refer to the ...

Страница 2: ...00 Series ACTB for all mounting details including door opening space If bottom cable entry is used the foundation must be prepared so that the conduit stubs are located correctly Refer to the appropriate enclosure outline drawing for specified cable entrance area and location Provide cable bending space and clearance to live metal parts When a concrete floor is poured use interlocking conduit spac...

Страница 3: ...ply joint compound to conductor then carefully wipe away excess compound Tighten the cable lugs to the torque specified on the rating label Be sure that the Normal and Emergency power connections are in proper phase rotation Bus Connections If bus connection is used use SAE grade 5 hardware to connect bus to appropriate terminal plates on bypass switching device Wipe off bus surfaces before they a...

Страница 4: ...s See Figure 1 3 Black square means light is on White square means light is off If necessary adjust voltage regulator on generator per the manufacturer s recommendations The ACTB will respond only to rated voltage specified on the nameplate Now continue to 2 Electrical Operation on next page 1 Close the normal source circuit breaker The Transfer Switch Connected To Normal and the Normal Source Acc...

Страница 5: ...ans light is on White square means light is off 3 Turn the Isolation Handle clockwise approximately 16 turns to the CONN connected position 4 Push in the Bypass Handle and turn it counterclock wise until the OPEN indicator shows green This completes the Functional Test of the ACTB 1 Turn and hold Transfer Control switch clockwise to Transfer Test until the engine starts and runs within 15 sec The ...

Страница 6: ...closure Brush and vacuumaway any excessive dust accumulation Remove any mois ture with a clean cloth Check the transfer switch contacts Remove transfer switch barriers and check the condition of the contacts Replace contacts when pitted or worn excessively Reinstall the barriers carefully Maintain transfer switch lubrication If switch is subjected to severe dust or abnormal operating con ditions r...

Страница 7: ... Feature 2E time delay to time out Starting control must be in the automatic position Failure to Synchronize light comes on Conditions of Normal or Emergency Sources not suitable for closed transition transfer Recheck voltage and frequency of both sources Press Alarm Reset pushbutton Extended Parallel Time light comes on CN and CE contacts are closed longer than setting in the Control Panel Open t...

Страница 8: ... ATS is bypassed to Normal Source Figure 3 1 Bypass Handle and position indicators To Bypass Normal Source Load connected to Normal Source The Transfer Switch Connected To Normal light is on and Transfer Switch Connected To Emergency light is off Push in the Bypass Handle all the way then turn it clockwiseuntil Bypass Switch Positionshows CLOSEDon NORMAL yellow indicator The red light Unit Not In ...

Страница 9: ...tch Bypass Switch Figure 3 5 TEST to ISOLATE position 4 Open the lower enclosure door Pull out the side rail carriage then roll out the transfer switch It can be safely inspected in this position The transfer switch can also be removed for easier maintenance opera tions unfold crank position window CONN TEST ISOLATE counterclockwise draws out transfer switching device Figure 3 6 Isolation Handle N...

Страница 10: ...s black NORMAL or EMERGENCY at the Bypass Switch Handle This indicates the source connected to the load 4 Observe which Transfer Switch Connected To light is on Normal or Emergency on the door This is the positionoftheTransferSwitch If itis notin thesame position as the Bypass Handle change the position of the Transfer Switch as follows To change the position of transfer switch Operate to NORMAL O...

Страница 11: ...assed to Emergency or yellow NORMAL when ATS is bypassed to Normal Source Figure 3 11 Bypass Handle and position indicators To Un Bypass Normal Source Load connected to Normal Source The Transfer Switch Connected To Normal light is on and Transfer Switch Connected To Emergency light is off Push in the BypassHandle thenturn itcounterclockwise until Bypass Switch Position shows OPEN green indica tor...

Страница 12: ...1 maintenance handle 2 2 warning 2 2 manual load transfer 2 2 warning 2 2 N nameplate cover Normal Source Accepted light 1 3 O operation electrical 1 4 manual 2 2 warning 2 2 P parts 2 1 phase rotation check 1 3 preventive maintenance 2 1 problem 2 2 R rating label cover removal of shipping angles 1 1 removal of shipping skid 1 1 replacement parts 2 1 return to service 3 3 S service ASCO Services ...

Отзывы: