background image

INSTALLATION

(continued)

1---3

RED

RED

GREEN

GREEN

observe

these lights

RED

RED

RED

Figure 1-3. Standard controls and indicators.

Functional Test

Read all instructions on the

Wiring Diagrams

and labels

affixed to the ACTB. Note the control features that are
provided and review their operation before proceeding.
After installing the ACTB check the following:

– Bypass Handle should be in the

OPEN

position.

– Isolation Handle should be in the

CLOSED

position.

– CN transfer switch should be

CLOSED.

– CE transfer switch should be

OPEN

.

If handles are not in correct positions, follow instructions
for Bypassing and Isolating the automatic transfer switch
in

Section 3

.

Do not force the handles

. Electrical

interlocks prevent a wrong sequence of operation.

1 – Voltage Checks

First check nameplate on transfer switch; rated voltage
must be the same as normal and emergency line voltages.

Use extreme caution when using a meter

to measure voltages. Do not touch power

terminals; shock, burns, or death could result !

Perform steps 1–6 at the right. Observe the status lights.
See Figure 1–3.

Black square means light is on.

White square means light is off.

* If necessary, adjust voltage regulator on generator per the
manufacturer’s recommendations. The ACTB will respond only
to rated voltage specified on the nameplate.

Now continue to

2 – Electrical Operation

on next page.

1

Close the normal source circuit

breaker. The

Transfer Switch

Connected To Normal

and the

Normal Source Accepted

lights

should come on.

2

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch normal

source terminals.

3

Close the emergency source

circuit breaker. Turn the

Engine

Control

switch to

Run

to start

the generator. The

Transfer

Switch Connected To Normal

&

Emergency Source Accepted

lights should come on.

4

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch emer-

gency source terminals.*

5

Use a phase rotation meter to

check phase rotation of emer-

gency source; it must be the

same as the normal source.

A B C

6

Turn

Engine Control

switch to

Auto

to stop the generator. The

Emergency Source Accepted

light should go off. Then put the

starting control selector switch

(on generator set) in

automatic

position. Close enclosure door.

Содержание ASCO 7000 Series

Страница 1: ...ies ACTB for all installation and connection details and accessories Refer to Group 5 Controller User s Guide 381333 126 for ATS status display messages time delays pickup dropout settings and adjustments An experienced licensed electrician must install the 7ACTB Rating Label Each 7000 Series 7ACTB contains a rating label to define the load and fault circuit withstand closing ratings Refer to the ...

Страница 2: ...00 Series ACTB for all mounting details including door opening space If bottom cable entry is used the foundation must be prepared so that the conduit stubs are located correctly Refer to the appropriate enclosure outline drawing for specified cable entrance area and location Provide cable bending space and clearance to live metal parts When a concrete floor is poured use interlocking conduit spac...

Страница 3: ...ply joint compound to conductor then carefully wipe away excess compound Tighten the cable lugs to the torque specified on the rating label Be sure that the Normal and Emergency power connections are in proper phase rotation Bus Connections If bus connection is used use SAE grade 5 hardware to connect bus to appropriate terminal plates on bypass switching device Wipe off bus surfaces before they a...

Страница 4: ...s See Figure 1 3 Black square means light is on White square means light is off If necessary adjust voltage regulator on generator per the manufacturer s recommendations The ACTB will respond only to rated voltage specified on the nameplate Now continue to 2 Electrical Operation on next page 1 Close the normal source circuit breaker The Transfer Switch Connected To Normal and the Normal Source Acc...

Страница 5: ...ans light is on White square means light is off 3 Turn the Isolation Handle clockwise approximately 16 turns to the CONN connected position 4 Push in the Bypass Handle and turn it counterclock wise until the OPEN indicator shows green This completes the Functional Test of the ACTB 1 Turn and hold Transfer Control switch clockwise to Transfer Test until the engine starts and runs within 15 sec The ...

Страница 6: ...closure Brush and vacuumaway any excessive dust accumulation Remove any mois ture with a clean cloth Check the transfer switch contacts Remove transfer switch barriers and check the condition of the contacts Replace contacts when pitted or worn excessively Reinstall the barriers carefully Maintain transfer switch lubrication If switch is subjected to severe dust or abnormal operating con ditions r...

Страница 7: ... Feature 2E time delay to time out Starting control must be in the automatic position Failure to Synchronize light comes on Conditions of Normal or Emergency Sources not suitable for closed transition transfer Recheck voltage and frequency of both sources Press Alarm Reset pushbutton Extended Parallel Time light comes on CN and CE contacts are closed longer than setting in the Control Panel Open t...

Страница 8: ... ATS is bypassed to Normal Source Figure 3 1 Bypass Handle and position indicators To Bypass Normal Source Load connected to Normal Source The Transfer Switch Connected To Normal light is on and Transfer Switch Connected To Emergency light is off Push in the Bypass Handle all the way then turn it clockwiseuntil Bypass Switch Positionshows CLOSEDon NORMAL yellow indicator The red light Unit Not In ...

Страница 9: ...tch Bypass Switch Figure 3 5 TEST to ISOLATE position 4 Open the lower enclosure door Pull out the side rail carriage then roll out the transfer switch It can be safely inspected in this position The transfer switch can also be removed for easier maintenance opera tions unfold crank position window CONN TEST ISOLATE counterclockwise draws out transfer switching device Figure 3 6 Isolation Handle N...

Страница 10: ...s black NORMAL or EMERGENCY at the Bypass Switch Handle This indicates the source connected to the load 4 Observe which Transfer Switch Connected To light is on Normal or Emergency on the door This is the positionoftheTransferSwitch If itis notin thesame position as the Bypass Handle change the position of the Transfer Switch as follows To change the position of transfer switch Operate to NORMAL O...

Страница 11: ...assed to Emergency or yellow NORMAL when ATS is bypassed to Normal Source Figure 3 11 Bypass Handle and position indicators To Un Bypass Normal Source Load connected to Normal Source The Transfer Switch Connected To Normal light is on and Transfer Switch Connected To Emergency light is off Push in the BypassHandle thenturn itcounterclockwise until Bypass Switch Position shows OPEN green indica tor...

Страница 12: ...1 maintenance handle 2 2 warning 2 2 manual load transfer 2 2 warning 2 2 N nameplate cover Normal Source Accepted light 1 3 O operation electrical 1 4 manual 2 2 warning 2 2 P parts 2 1 phase rotation check 1 3 preventive maintenance 2 1 problem 2 2 R rating label cover removal of shipping angles 1 1 removal of shipping skid 1 1 replacement parts 2 1 return to service 3 3 S service ASCO Services ...

Отзывы: