
later release. With full support for communication between AMS Asset Monitors ensure
that each AMS Asset Monitor has a unique Address Plug installed.
The third RJ-45 Ethernet socket with a speed of 1 Gbit/s is to connect to a WAN
configuration and to connect to subsequent systems such as Plantweb Optics. See
for the location of the RJ-45 sockets.
To keep the IP protection class of the AMS Asset Monitor, Emerson recommends not to
use prefabricated Ethernet cables with RJ-45 plugs. Instead, use Ethernet cables without
plugs and RJ-45 plugs that can be crimped onto an Ethernet cable.
Prerequisites
•
RJ 45 plugs that can be crimped onto an Ethernet cable.
•
Crimping tool for RJ 45 plugs, if required for the selected plugs.
•
Cable tester
•
CAT 5(e) or higher Ethernet cable
•
Maximum Ethernet cable length between devices is 100 meters.
•
Installation in accordance to Ethernet standards.
All Ethernet cables used to connect the AMS Asset Monitor must be made, installed, and
tested by an experienced LAN installer.
Follow the steps to connect an Ethernet cable:
Procedure
1. Lead the Ethernet cable through a suitable cable gland at the bottom of the AMS
Asset Monitor.
2. Strip the Ethernet cable in accordance to the needs of the RJ 45 plug.
3. Crimp the RJ 45 plug on the Ethernet cable.
4. Plug the RJ 45 plug into the needed Ethernet connector.
4.11.1
Permissible network topology
There are three different permissible network topologies available to connect up to eight
AMS Asset Monitors:
Daisy-chained network
Devices connected in series.
Star network
Devices connected to a central switch.
Hybrid network
A mix of the daisy-chained network and the star network
Note
With full support for communication between AMS Asset Monitors ensure that each AMS
Asset Monitor has a unique Address Plug installed. Two or more Address Plugs with the
same number within a network cause communication failure.
4
W
ide
A
rea
N
etwork
Installing AMS Asset Monitor hardware
Installation Guide
April 2020
MHM-97923-PBF
42
MHM-97923-PBF, Rev. 1.0
Содержание AMS
Страница 8: ...Contents Installation Guide April 2020 MHM 97923 PBF viii MHM 97923 PBF Rev 1 0 ...
Страница 14: ...General Installation Guide April 2020 MHM 97923 PBF 14 MHM 97923 PBF Rev 1 0 ...
Страница 22: ...Planning the installation Installation Guide April 2020 MHM 97923 PBF 22 MHM 97923 PBF Rev 1 0 ...
Страница 72: ...Removing CHARMs hardware Installation Guide April 2020 MHM 97923 PBF 72 MHM 97923 PBF Rev 1 0 ...
Страница 76: ...Hazardous location installation Installation Guide April 2020 MHM 97923 PBF 76 MHM 97923 PBF Rev 1 0 ...
Страница 86: ...Technical data Installation Guide April 2020 MHM 97923 PBF 86 MHM 97923 PBF Rev 1 0 ...
Страница 87: ...10 Certificates Installation Guide Certificates MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 87 ...
Страница 88: ...Certificates Installation Guide April 2020 MHM 97923 PBF 88 MHM 97923 PBF Rev 1 0 ...
Страница 89: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 89 ...
Страница 90: ...Installation Guide April 2020 MHM 97923 PBF 90 MHM 97923 PBF Rev 1 0 ...
Страница 91: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 91 ...