40
Table 8.7 (cont.): Installer Menus (2000 Level)
BOILER CONTROL: INTERNAL WIRING & OPERATION
Status
(2000)
Parameters
Parameter Function
Unit/Value Default
Options
2025
Warm Weather Shutdown Temperature
– Outdoor temperature that will block all CH demands until temperature falls below
this value
°F
72
2026
Boost Function: Increment
– Calculated Setpoint increase after boost delay time period is met
– Boost will continually increase setpoint every boost time period until demand is met
or Maximum CH Setpoint design limit is reached.
°F
5
2027
Boost Function: Delay
– Time delay before boost function activates during a single demand
Minutes
20
2028
CH Night Setback Temperature
– Calculated CH Setpoint setback value when the Night Setback Function is activated
°F
10
2035
DHW mode
#
5
2036
NON FUNCTIONAL
2037
NON FUNCTIONAL
2038
NON FUNCTIONAL
2042
Domestic Hot Water Priority
– Does not function for Peak Applications
0/1/2/3
2
2043
Domestic Hot Water Priority Time
– Does not function in Peak Applications
Minutes
60
2044
DHW Post Purge- Circulator
Seconds
10
2048
DHW Setpoint
°F
122
2064
Preheat Mode
– 0: OFF
– 1: Anti Frost – plate heat exchanger is kept above 41°F
– 2: Eco Mode – plate heat exchanger is kept above 86°F for faster response at
expense of fuel utilization.
– 3: Comfort Mode – plate heat exchanger is kept at DHW for fastest response at
greatest expense to fuel utilization
#
1
2091
Maximum DHW Setpoint
°F
176
2096
Minimum DHW Setpoint
°F
2109
CH Calculated Setpoint Offset
– Allows the manual adjustment of the Calculated CH Setpoint by this value
°F
0
2110
Minimum CH Setpoint
°F
68
2111
Maximum CH Setpoint
°F
190
2112
CH Hysteresis Down
°F
9
2113
Maximum DHW Power
– Limits the maximum available input to the boiler to satisfy DHW demands
%
100
2114
Minimum DHW Power
– Limits the minimum available input to the boiler to satisfy DHW demands
%
1
2115
NON FUNCTIONAL
2124
- FACTORY SET. DO NOT CHANGE
- WARNING: CHANGING THESE SETTINGS
WILL CAUSE BOILER TO NOT OPERATE
PROPERLY
#
0
2125
#
2
2126
#
9
2127
#
0
2128
#
0
2129
#
0
2130
Flow Scaling Factor
– NON FUNCTIONAL
2131
Minimum CH Loop Pressure
– Pressure at Boiler will shut down after “FILL” warning will appears
PSI
10.2
Содержание Peak-40
Страница 22: ...22 WATER PIPING AND CONTROLS Figure 4 6 Recommended Central Heat Piping ...
Страница 23: ...23 WATER PIPING AND CONTROLS Figure 4 7 Recommended Central Heat Piping with Hydronic Separator ...
Страница 24: ...24 WATER PIPING AND CONTROLS Figure 4 8 Recommended Domestic Hot Water Piping ...
Страница 33: ...33 ELECTRICAL CONNECTIONS Figure 7 4 Wiring Schematic and Connection ...
Страница 47: ...47 START UP PROCEDURE E LIGHTING OPERATING PROCEDURES ...
Страница 59: ...59 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 62: ...62 REPAIR PARTS Figure 13 2 Peak 40 LP Combustion Components ...
Страница 64: ...64 REPAIR PARTS Figure 13 3 Peak 40 NG Combustion Components ...
Страница 66: ...66 REPAIR PARTS Figure 13 4 CHB Parts Detail ...
Страница 68: ...315 Oser Avenue Hauppauge NY 11788 Tel 631 694 1800 Fax 631 694 1832 www embassyind com ...