3
DANGER
WARNING
CAUTION
NOTICE
IMPORTANT NOTICE
USING THIS MANUAL
USING THIS MANUAL
A. INSTALLATION SEQUENCE
Follow the installation instructions provided in this manual in
the order shown. The order of these instructions has been set in
order to provide the installer with a logical sequence of steps that
will minimize potential interferences and maximize safety during
boiler installation.
B. SPECIAL ATTENTION BOXES
Throughout this manual special attention boxes are provided
to supplement the instructions and make special notice of
potential hazards. The definition of each of these categories, in
the judgement of Embassy Industries are as follows:
Indicates a condition or hazard which will cause severe
personal injury, death or major property damage.
Indicates a condition or hazard which may cause severe
personal injury, death or major property damage.
Indicates special attention is needed, but not directly
related to potential personal injury or property
damage.
Indicates special attention is needed, but not directly
related to potential personal injury or property
damage.
In accordance with Section 325 (f) (3) of the Energy Policy and Conservation Act, this boiler is equipped with a
feature that saves energy by reducing the boiler water temperature as the heating load decreases. This feature is
equipped with an override which is provided primarily to permit the use of an external energy management system
that serves the same function.
THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE:
·
An external energy management system is installed that reduces the boiler water temperature as the heating
load decreases.
·
This boiler is not used for any space heating
·
This boiler is part of a modular or multiple boiler system having a total input of 300,000 BTU/hr or greater.
·
This boiler is equipped with a tankless coil.
Compliance with the Energy Policy and Conservation Act:
Содержание Peak-40
Страница 22: ...22 WATER PIPING AND CONTROLS Figure 4 6 Recommended Central Heat Piping ...
Страница 23: ...23 WATER PIPING AND CONTROLS Figure 4 7 Recommended Central Heat Piping with Hydronic Separator ...
Страница 24: ...24 WATER PIPING AND CONTROLS Figure 4 8 Recommended Domestic Hot Water Piping ...
Страница 33: ...33 ELECTRICAL CONNECTIONS Figure 7 4 Wiring Schematic and Connection ...
Страница 47: ...47 START UP PROCEDURE E LIGHTING OPERATING PROCEDURES ...
Страница 59: ...59 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 62: ...62 REPAIR PARTS Figure 13 2 Peak 40 LP Combustion Components ...
Страница 64: ...64 REPAIR PARTS Figure 13 3 Peak 40 NG Combustion Components ...
Страница 66: ...66 REPAIR PARTS Figure 13 4 CHB Parts Detail ...
Страница 68: ...315 Oser Avenue Hauppauge NY 11788 Tel 631 694 1800 Fax 631 694 1832 www embassyind com ...