29
GB
INSTALLATION
UNPACKNING
__________________________________________________________
NOTE!
Handle the drying cabinet carefully if it is standing on a pallet!
RISK OF TIPPING!!
__________________________________________________________
Check that the goods have not been damaged in transport. Any transport damage must be
reported to the retailer within 7 days.
__________________________________________________________
After unpacking the product, check that it is free from damage. Any damage, faults or missing
parts must be reported to the retailer immediately.
__________________________________________________________
Check that all transport safety devices have been removed before connecting the drying
cabinet.
__________________________________________________________
Keep packaging materials such as plastics and polystyrene foam away from children.
__________________________________________________________
INSTALLATION KIT
Full delivery should include:
• Cabinet with pre-installed fan unit
• Installation kit:
• User manual
Qty.
1. Ventilation adapter
(1)
2. Hose
(1)
3. Collar
(1)
4. Screw TRX 5x70 zinc-plated (2)
5. Washer NB 5x25
(2)
6. Wall plug
(2)
7. Spacer 8.2x12x15
(2)
8. Cover plug, white
(4)
9. Allen key
(1)
10. Door handle with fixing screws (1)
2
5
6
3
7
8
9
1
4
10