13
Fig. 09: Schematic Wiring Diagram - Basic 2 x 2 port valve system ( ‘S’ plan )
Fig. 10: Schematic Wiring Diagram - 3 port mid position valve system, ( ‘Y’ plan ). N.B. Must be used in conjunction
with 2 port zone valve supplied
NOTES: Control terminal numbering may differ from those shown.
Refer to instructions with controls selected.
A double pole isolating switch must be installed in the mains supply.
All earth connections must be connected back to the mains earth supply.
L
1
N
2 3
HTG
ON
DHW
ON
L N
2 3
1
L
2
N
3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
(Supply)
1 2 3
G
1
Br Bl
2
0
GY
3
G
1
Br Bl
2
0
1 3 2
2
L
N
Programmer
Boiler
Pump
Zone valve (HTG)
Cylinder terminal block
Room stat
Zone valve (DHW)
(supplied)
Junction box
3
2
3
L
1
N
2 3
HTG
ON
DHW
ON
L N
2 3
1
L
2
N
3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
(Supply)
1 2 3
G W Bl
2
0
GY
3
G
1
Br Bl
2
0
L
N
Programmer
Boiler
Pump
3 Port Zone valve
Cylinder terminal block
1 3 2
2
Room stat
Zone valve (DHW)
(supplied)
Junction box
NOTES: Control terminal numbering may differ from those shown.
Refer to instructions with controls selected.
A double pole isolating switch must be installed in the mains supply.
All earth connections must be connected back to the mains earth supply.
3
DHW
OFF
2
3
Содержание Zircon 190 S Ind
Страница 22: ...22 NOTES ...
Страница 23: ...23 NOTES ...