Safety

DISCONNECT  FROM  THE  MAINS  ELECTRICAL 

SUPPLY BEFORE REMOVING ANY COVERS.

Never attempt to replace the immersion heater other 

than with the recommended authorised immersion 

heater(s).

DO NOT 

BYPASS THE THERMAL CUT-OUT(S) IN 

ANY CIRCUMSTANCES. Ensure the two male spade 

terminations on the combined thermostat and thermal 

cut-out  are  pushed  firmly  onto  the  corresponding 

terminations on the element assembly. 

In case of difficulty contact service support; contact 

details available at the back of this booklet.

Electrical Supply

All  electrical  wiring  should  be  carried  out  by  a 

competent electrician and be in accordance with the 

latest I.E.E Wiring Regulations.

Each circuit must be protected by a suitable fuse 

and double pole isolating switch with a contact 

separation of at least 3mm in both poles.

The immersion heater should be wired in accordance 

with Fig 08 opposite. The immersion heaters MUST be 

earthed. The supply cable should be 1.5mm

2

 3 core 

HO5 VV-F sheathed and must be routed through the 

cable grip provided with the outer sheath of the cable 

firmly secured by tightening the screws on the cable 

grip.

DO NOT operate the immersion heaters until the 

cylinder has been filled with water.

Ensure the thermostat and thermal cut-out sensing 

bulbs are pushed fully into the pockets on the element 

plate assembly.

Plumbing Connections

Indirect cylinders require the following

pipework connections.

• 

Cold water supply to and from inlet controls.

• 

Outlet to hot water draw off points. 

• 

Discharge pipework from valve outlets to 

tundish.

• 

Connection to the primary circuit.

All  connections  are  22mm  compression.  However, 

3/4”BSP parallel threaded fittings can be fitted to the 

primary coil connections if required.

Boiler Selection

The boiler should have a control thermostat and non 

self-resetting thermal cut-out and be compatible with 

unvented storage water heaters.

Where  use  of  a  boiler  without  a  thermal  cut-out  is 

unavoidable a “low head” open vented primary circuit 

should be used. The feed and expansion cistern head 

above the cylinder should not exceed 2.5m.

Primary Circuit Control

The 2 port motorised valve supplied with the cylinder 

MUST be fitted on the primary flow to the cylinder heat 

exchanger (coil) and wired in series with the indirect 

control  thermostat  and  thermal  cut-out  fitted  to  the 

unit. (see Fig. 08 below).  Primary circulation to the 

cylinder heat exchanger (coil) must be pumped;  gravity 

circulation WILL NOT WORK.

Space and Heating Systems Controls

The controls provided with the cylinder will ensure the 

safe operation of the unit within the central heating 

system.  Other  controls  (eg.  room  thermostat  and 

timer) will be necessary to control the space heating 

requirements and times that the system is required to 

function.The cylinder is compatible with most 

heating 

controls, examples of electrical circuits are shown in 

Figs. 09 and 10 (Page 13). 

However, other systems 

may be suitable, refer to the controls manufacturers’ 

instructions,  supplied  with  the  controls  selected,  for 

alternative system wiring schemes.

Installation - 

Auxiliary Heating Coil

Fig. 08: Electrical Connections 

L N

1 2 3

Control Housing Details

Element Connections

1.5mm² 3 Core
HO5 VV-F sheathed 
cable

Indirect control
wiring

Содержание Zircon 190 S Ind

Страница 1: ...xpansion vessel mounting bracket Tundish 2 Port motorised valve Compression nuts olives Immersion heater spanner Installation servicing instructions Guarantee card IMPORTANT Please read understand all these instructions before commencing installation Please leave this manual with the customer for future reference Zircon Installation Manual Unvented Solar Indirect Water Heaters Installation Servici...

Страница 2: ...ons Section G3 The following instructions are offered as a guide to installation which must be carried out by a competent plumbing and electrical installer in accordance with Building Regulation G3 The Building Standards Scotland Regulations 1990 or The Building Regulations Northern Ireland NOTE Prior to installation the unit should be stored in an upright position in an area free from excessive d...

Страница 3: ...er supply to the property will be supplying both the hot and cold water requirements simultaneously It is recommended that the maximum water demand is assessed and the water supply checked to ensure this demand can be satisfactorily met Note A high mains water pressure will not always guarantee high flow rates Wherever possible the mains supply pipe should be 22mm We suggest the minimum supply req...

Страница 4: ...IRCUIT CONTROL OF THE SOLAR PRIMARY CIRCUIT IS ACHIEVED BYTHE USE OF EXTERNALCONTROLS NOT SUPPLIED WITH THE UNIT CONTROL MUST BEAPURPOSE DESIGNED SOLAR DIFFERENTIAL TEMPERATURE CONTROLLER Checklist Unvented cylinder Cold control pack Tundish Combination valve Expansion vessel Tool Element spanner Compression nuts olives 2 Port motorised valve Literature pack Installation manual Guarantee card Oper...

Страница 5: ...he unit The expansion vessel is pre charged at 0 35MPa 3 5 bar The expansion vessel must be connected between the expansion valve and the cylinder see Fig 06 Page 10 The location of the expansion vessel should allow access to recharge the pressure as and when necessary this can be done using a normal car foot pump It is recommended that the expansion vessel is adequately supported An expansion ves...

Страница 6: ...Rating kW Heat up Time mins Hot Water Capacity ltrs volume of water drawn off 40 C A B C D Solar Auxiliary Solar Indirect 190 S Ind 1401 1085 784 925 65 120 19 14 2 32 132 210 S Ind 1499 1186 1012 1026 85 120 19 15 0 25 196 250 S Ind 1752 1438 1143 1279 95 145 19 15 2 30 237 300 S Ind 2065 1752 1440 1592 120 175 19 17 4 32 265 D B 373 C A 415 SOLAR RETURN SOLAR FLOW COLD INLET HOT OUTLET T P VALVE...

Страница 7: ...ndish 3 54 The tundish should be vertical located in the same space as the unvented hot water storage system and be fitted as close as possible to and lower than the valve with no more than 600mm of pipe between the valve outlet and the tundish see Fig 05 page 9 Note To comply with the Water Supply Water Fittings Regulations the tundish should incorporate a suitable air gap 3 55 Any discharge shou...

Страница 8: ... to prevent contact whilst maintaining visibility and c discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof capable of withstanding high temperature discharges of water and 3m from any plastic guttering system that would collect such discharges 3 63 The discharge would consist of high temperature water and steam Asph...

Страница 9: ... ELBOW OR BEND G 1 2 15MM 22mm 28mm 35mm UP TO 9M UP TO 18M UP TO 27M 0 8M 1 0M 1 4M G 3 4 22MM 28mm 35mm 42mm UP TO 9M UP TO 18M UP TO 27M 1 0M 1 4M 1 7M G 1 28MM 35mm 42mm 54mm UP TO 9M UP TO 18M UP TO 27M 1 4M 1 7M 2 3M 600mm maximum 300mm minimum Safety device e g Temperature relief valve Metal discharge pipe D1 from Temperature relief valve to tundish Tundish Discharge below fixed grating Bui...

Страница 10: ...ection if required Cold water combination valve Mains water supply Isolating valve not supplied Discharge pipe Tundish Drain cock not supplied Secondary return if required use swept tee Inlet Boost element Auxillary control housing Solar controls housing Auxillary Primary return Auxillary Primary flow Solar Primary return o Secondary Return Tapping if required ...

Страница 11: ...roller should be fully inserted with the thermal cut out probe into the pocket provided on the SOLAR cylinder The cable must be secured using the cable clamps on the controls housing Connection to the solar controller should be in accordance with the manufacturers instructions The solar controller should be programmed to give a cylinder temperature of approximately 60 C maximum 70 C THERMAL CUT OU...

Страница 12: ...pework from valve outlets to tundish Connection to the primary circuit All connections are 22mm compression However 3 4 BSP parallel threaded fittings can be fitted to the primary coil connections if required Boiler Selection The boiler should have a control thermostat and non self resetting thermal cut out and be compatible with unvented storage water heaters Where use of a boiler without a therm...

Страница 13: ...8 9 10 1 2 3 4 5 6 7 8 9 10 Supply 1 2 3 G 1 Br Bl 2 0 GY 3 G 1 Br Bl 2 0 1 3 2 2 L N Programmer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW supplied Junction box 3 2 3 L 1 N 2 3 HTG ON DHW ON L N 2 3 1 L 2 N 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 Supply 1 2 3 G W Bl 2 0 GY 3 G 1 Br Bl 2 0 L N Programmer Boiler Pump 3 Port Zone valve Cylinder terminal block 1 3 2 2 R...

Страница 14: ...aximum storage temperature in the cylinder of 70 C 60 C is recommended to minimise scaling Secondary heating coil Fill the secondary circuit following the boiler manufacturer s commissioning instructions To ensure the cylinder primary heat exchanger is filled the 2 port motorised valve supplied should be manually opened by moving the lever on the motor housing to the MANUAL setting When the primar...

Страница 15: ...emove the thermostat capillaries Note the order of the capillaries within the pocket Remove the terminal shroud Unscrew immersion heater backnut and remove immersion heater from the unit A key spanner is supplied with the cylinder unit for easy removal tightening of the immersion heater Over time the immersion heater gasket may become stuck to the mating surface To break the seal insert a round bl...

Страница 16: ...due to aeration of the water is quite normal and will quickly clear Temperature Controls Solar Temperature control of the solar primary coil is by means of solar differential temperature controller This will usually have been set during commissioning to give a storage temperature of approximately 60 C Refer to user instructions supplied with the controller for details of how to adjust this if requ...

Страница 17: ...connections to motorised valve Water discharges from expansion valve INTERMITTENTLY Expansion vessel charge pressure has reduced below 3 5 bar or set to high See maintenance section for re charging of expansion vessel procedure CONTINUALLY Cold water combination valve pressure reducer not working correctly Expansion valve seat damaged Check pressure from cold water combination valve If greater tha...

Страница 18: ...bination valve complete 70 344 68 7 Direct combined thermostat and thermal cut out 95 612 717 8 Indirect combined thermo stat and thermal cut out 95 612 716 9 Thermal cut out 95 612 698 10 Terminal cover 77 008 62 11 6 way terminal block 95 607 933 12 Accessory kit Indirect without expansion vessel 95 607 968 13 Solar pocket assembly 95 607 064 14 Expansion vessel 24 litre 95 607 612 15 3 way term...

Страница 19: ...ling of waste electrical equipment The separate collection and recycling of your waste equipment at the time of disposal will help to conserve natural resources and ensure that it is recycled in a manner that protects human health and the environment For more information about where you can drop off your waste equipment for recycling please contact your local city office your household waste dispo...

Страница 20: ...t set temperature C I min Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet C All appropriate pipes have been insulated up to 1 metre or the point where they become concealed Yes UNVENTED SYSTEMS ONLY What is the pressure reducing valve setting bar Yes No The tundish and di...

Страница 21: ...e Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date Engineer name Company name Telephone No Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Comments Signature SERVICE 06 Date Engineer name Company name Telephone No Comments S...

Страница 22: ...22 NOTES ...

Страница 23: ...23 NOTES ...

Страница 24: ... of supply may be required The guarantee is transferable This guarantee does not affect your statutory rights Servicing Baxi Customer Support Baxi Customer Support is Elson s service division With us on your side you can be sure that your customers are in the very best of hands Totally committed to quality and safety Baxi Customer Support is open 7 days a week 363 days a year excluding Christmas D...

Отзывы: