7
Installation and commissioning
Attention! Mains voltage! The legal national regulations
must be complied with.
Installation, inspection, commissioning and troubleshooting of the power supply
system must only be carried out by a competent electrician. Disconnect all lines to be
assembled, and take safety precautions against accidental switch-on.
The power supply is exclusively intended for appropriate use. With each inappropriate
change or non-observance of the instructions for use, any warranty or guarantee claim
will be void.
After unpacking the device, check immediately for any mechanical damages. In case of
transport damage, this must immediately notified to the supplier.
If damaged, the power supply system must not be put
into operation.
If an operation without risk may supposedly not be guaranteed, the plant must be put
out of operation and be secured against accidental operation.
The power supply system must only be operated as stationary system, i.e. only in a
fitted state and after completion of all installation and start-up works, and only in the
environment intended for this purpose.
Elsner Elektronik does not assume any liability for changes in standards after
publication of this instruction manual.
Installation
Observe the correct installation. Incorrect installation may destroy the power supply
system or connected electronic devices.