background image

6

Display and operation at the device

Temperature sensor KNX T-B-UP

 • Software version 3.1 and higher

Status: 21/03/2016 • Technical changes and errors excepted.

2.3.2. Rear view sensor plate with connection

2.4. Assembly of the sensor

First of all fit the socket with connection. Seal inlet pipes to avoid infiltration. 
Then screw the base plate onto the socket and position the frame of the switching pro-
gramme. Connect the bus line +/- (black-red plug) to the terminals provided on the sen-
sor board of the sensor. Pin the sensor with the notches on to the metal frame, so that
sensor and frame are fixed.

2.5. Notes on mounting and commissioning

Never expose the device to water (e.g. rain) or dust. This can damage the electronics.
You must not exceed a relative humidity of 95%. Avoid condensation.

After the bus voltage has been applied, the device will enter an initialisation phase last-
ing a few seconds. During this phase no information can be received or sent via the
bus.

3.

Display and operation at the device

Specifications for the display are set in the ETS and the use of the push buttons is per-
mitted or disabled. 

Basically the display can show a two-row or three-row text (e. g. for measured values)
or a tempertuare controller. You can switch between the two types by pressing one of
the buttons, if this has not been disabled in the ETS.

3.1. Mode display and manual temperature 

controller

Depending on the ETS setting selected, the mode display will only display show the
current target value, or the base target value setting with scale display. The manually
adjustable range can be set in the ETS.

Fig. 2
1

KNX terminal BUS +/-

2

Catches

2

1

Содержание 70358

Страница 1: ...360 70361 EN Elsner Elektronik GmbH Control and Automation Engineering Sohlengrund 16 D 75395 Ostelsheim Phone 49 0 70 33 30 945 0 info elsner elektronik de Germany Fax 49 0 70 33 30 945 20 www elsner...

Страница 2: ...ittings Functions Temperature measurements Composite value from own measured value and external value proportions are adjusted as a percentage Display 1 3 lines measured value or values received via b...

Страница 3: ...similar to RAL 9016 Traffic White Matt aluminium Charcoal matt Stainless steel Special colours on request Assembly Flush mounting Wall mounting in junction box 60 mm 42 mm depth Protection category I...

Страница 4: ...regulations are to be followed Ensure that all lines to be assembled are free of voltage and take precautions against accidental switching on Do not use the device if it is damaged Take the device or...

Страница 5: ...from ducts which lead from other rooms to the junction box in which the sensor is mounted Warming or cooling of the building structure on which the sensor is mounted e g due to sunlight heating or col...

Страница 6: ...ics You must not exceed a relative humidity of 95 Avoid condensation After the bus voltage has been applied the device will enter an initialisation phase last ing a few seconds During this phase no in...

Страница 7: ...y for adjusting the base target value The control position in the image reads Base target val ue reduced Fig 5 Mode display with scale display and number Shows the set target value change The control...

Страница 8: ...in the ETS or be suppressed for Priority 1 operating modes The individual operating modes can also be locked for manual selection in the ETS Eco mode Night target temperature will be used Building pr...

Страница 9: ...an 2 secs Changes between the operating modes Comfort Standby Eco and Building Protection if deblocked in the ETS Extend Comfort mode in Eco mode press both buttons at the same time longer than 2 secs...

Отзывы: