B. CHECKS BEFORE INSTALLATION 

 

Before proceeding with the installation check the following: 
1)  Be sure that gate moves freely 
2)  There are no obstacles in the moving gate area 
3)  Hinges are properly positioned and greased 
4)  There should be no friction between the gate leaf’s 
5)  There should be no friction with the ground while moving the gates 
6)  Check that the gate structure is suitable to install automatic gate motors 
7)  “C” value is 140mm 
8)  “D” can be measured from the gate easily 
9)   “A” = “C” + “D” 
10)  The value of “B” can be calculated from the value of “A” and the leaves opening angle 

**Please make sure “B” and “A” are similar or the same in value that the leaf’s can be operated 
smoothly, also to reduce the burden of the motor. 

 

3

 

Содержание iS260

Страница 1: ...iS260 iS260D SWING GATE OPENER MANUAL iS260 iS260D SWING GATE OPENER USER MANUAL...

Страница 2: ...ON P 1 1 2 INSTALLATION A STANDARD INSTALLATION P 2 B INSTALLATION CHECK P 3 C REAR BRACKET INSTALLATION P 4 D FRONT BRACKET INSTALLATION P 5 E WIRE CONNECTION P 5 F EMERGENCY RELEASE P 6 1 3 TECHNICA...

Страница 3: ...rs Etc placed properly and way from children 7 For replace or repair of motorized system only original parts must be used Any damage caused by inadequate parts and methods will be not claimed to motor...

Страница 4: ...iS260 iS260D SWING GATE OPENER MANUAL 1 2 STANDARD INSTALLATION A STANDARD INSTALLATION 2...

Страница 5: ...o friction between the gate leaf s 5 There should be no friction with the ground while moving the gates 6 Check that the gate structure is suitable to install automatic gate motors 7 C value is 140mm...

Страница 6: ...ed position Connect the rear and front brackets to the motor Hold the rear bracket onto the pillar with the calculated A and B values Move the motor in a vertical direction until the fixing zone is in...

Страница 7: ...Position the front bracket in its position and manually move to gate to see that the motor is in the horizontal position in these positions 1 Gate in CLOSE position 2 Gate in OPEN position 3 Gate at 4...

Страница 8: ...N After successful motor installation refer to the user manual of the control card for automatic operation setup 1 Insert the release key to the manual release slot on either side of the motor 2 Turn...

Страница 9: ...tened 3 Check and make sure that the wire connections are in good condition Connect the power supply 1 Check the power adjustments 2 Check the function of the manual release 3 Check the photocells or...

Страница 10: ...iS260 iS260D SWING GATE OPENER MANUAL Service History Date Maintenance Installer 8...

Страница 11: ...GATE OPENER MANUAL Solar kits Solar panels Backup batteries Photo electric beams Magnetic locks Wireless keypads Pre formed vehicle loop Visit www elsema com to see our full range of Gate and Door Au...

Отзывы: