
89
Appendix A — Installation & Configuration
Check List
INSTALLATION CHECK LIST
Description
Date
Signature
Check contents of packaging
Remove from packaging
Prepare hole
Mount Meter
Connect Meter power supply
Connect 3 Current Transformers
Connect 3 Voltage lines
Connect Neutral line
Set Current Transformer Ratio
Connect Communication lines
Check Phase Order Connections
Set Time and Date
Appendix A Table - Installation & Configuration Check List
Содержание GR/PQ
Страница 1: ...Installation Operation Manual Elnet GR PQ Electrical Measurements Power Quality Ver 1 8...
Страница 18: ...18 To wire up the ElNet GR Energy Powermeter in Delta connection Figure 2 4 GR Schematic Delta Wiring Diagram...
Страница 19: ...19 To wire up the ElNet PQ Energy Powermeter in Star connection Figure 2 5 PQ Schematic Star Wiring Diagram...
Страница 20: ...20 To wire up the ElNet PQ Energy Powermeter in Delta connection Figure 2 6 PQ Schematic Delta Wiring Diagram...
Страница 23: ...23 Figure 2 7 Rear Panel Elnet GR Figure 2 8 Rear Panel Elnet PQ...