
45
4.9 Demand Setting.
The
ElNet GR/PQ
can determine the demand cycle time
.
In order to change the cycle time connected to the Elnet GR/PQ
See Section 4.1 for instructions to arrive at the Technical Menu.
1
From Technical Menu scroll to "
Next
" and Click “Enter”.
2
Scroll to “
Demand Setting”
and Click “Enter”.
3
The
Demand Setting
screen appears.
Figure 4.14
Demand Setting
4
Use “F1”/ "F2" in order to change the cycle time. The
cycle steps are: 1, 2, 3, 4, 5, 10, 15, 20, 30 and 60 minutes.
5
Click “Enter” for saving the change.
Содержание GR/PQ
Страница 1: ...Installation Operation Manual Elnet GR PQ Electrical Measurements Power Quality Ver 1 8...
Страница 18: ...18 To wire up the ElNet GR Energy Powermeter in Delta connection Figure 2 4 GR Schematic Delta Wiring Diagram...
Страница 19: ...19 To wire up the ElNet PQ Energy Powermeter in Star connection Figure 2 5 PQ Schematic Star Wiring Diagram...
Страница 20: ...20 To wire up the ElNet PQ Energy Powermeter in Delta connection Figure 2 6 PQ Schematic Delta Wiring Diagram...
Страница 23: ...23 Figure 2 7 Rear Panel Elnet GR Figure 2 8 Rear Panel Elnet PQ...