
39
4.3 TOU Setting
ElNet
Energy & Powermeter
is capable of working in
several TOU Settings. The user can choose the TOU Setting
according to the country requested.
To set TOU
See Section 4.1 for instructions to arrive at the
Technical Menu
From Technical Menu scroll to
TOU Setting
Click “Enter”.
The
TOU Setting
screen appears
.
Figure 4.8.
TOU Setting
Then scroll to the relevant country and press on the “Set” button,
“Active” will appear next to the country name.
To exit from that screen press on “Back” or “Enter” button.
Содержание GR/PQ
Страница 1: ...Installation Operation Manual Elnet GR PQ Electrical Measurements Power Quality Ver 1 8...
Страница 18: ...18 To wire up the ElNet GR Energy Powermeter in Delta connection Figure 2 4 GR Schematic Delta Wiring Diagram...
Страница 19: ...19 To wire up the ElNet PQ Energy Powermeter in Star connection Figure 2 5 PQ Schematic Star Wiring Diagram...
Страница 20: ...20 To wire up the ElNet PQ Energy Powermeter in Delta connection Figure 2 6 PQ Schematic Delta Wiring Diagram...
Страница 23: ...23 Figure 2 7 Rear Panel Elnet GR Figure 2 8 Rear Panel Elnet PQ...