2-10 COMMISSIONING
After mounting, wiring, configuring, and calibrating the HydroBlast system, check the
installation of the entire system using the commissioning checklist in below.
COMMISSIONING CHECKLIST
Company.
Site.
Order No.
Date.
Engineer.
System Type.
Installation Type.
Serial Numbers
Cannon:
Gateway:
Reference:
Pre Power-up Items
Check
Has cannon been securely mounted?
YES
NO
Has nozzle been installed on cannon?
YES
NO
Has protective cage been, installed if required?
YES
NO
Has gateway been installed?
YES
NO
Has horizontal rotation been calibrated?
YES
NO
Has vertical rotation been calibrated?
YES
NO
Has horizontal hard stop limits been set?
YES
NO
Has vertical travel limits been set?
YES
NO
Has stow position been set?
YES
NO
Has programming stop limits been set?
YES
NO
Are LED indication lights on Cannon onboard control all green?
YES
NO
Is correct power cable being used?
YES
NO
Is the correct communication cable between gateway and plant/remote control in use?
YES
NO
Has communication been established between gateway and Cannon?
YES
NO
Has communication been established between gateway and plant/remote control?
YES
NO
Is plant/remote control able to manage functions of the cannon correctly?
YES
NO
Has system been configured for this particular wash application?
YES
NO
Unit Configuration.
Is was time set correctly?
YES
NO
IS wash frequency set correctly?
YES
NO
Are hard stop limits set correctly?
YES
NO
Has valve been programmed to open and close correctly?
YES
NO
Has water supply line pressure been verified?
YES
NO
Notes:
Witnessed by
Please print name
Please sign here.