![Elite EL-110 LP Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/elite/el-110-lp/el-110-lp_installation-manual_2389424081.webp)
80
Boiler Manual
BOILER INSPECTION AND MAINTENANCE SCHEDULE
I
n
spectio
n
Activities
Pipi
n
g
1st Year
2nd Year
3rd Year
4th Year*
Near Heater Piping
Check heater and syste
m
piping for any sign of leakage, verify proper support
Vent
Check condition of all vent pipe and joints and supports. Note any deterioration and replace.
Gas
Check gas piping, test for gas leaks and signs of aging,
m
ake sure all pipes are supported properly.
Visual
Do a full visual inspection of all syste
m
co
m
ponents. Pay close attention to clearances of venting.
Make sure intake and exhaust screens are clean and clear of o
b
structions.
Functional
Test all functions of the syste
m
(Heat, DHW, Safeties)
Te
m
peratures
Verify safe settings on Super-Stor indirect fired water heater or Anti-Scald Valve (see part 12 for related
safet
y
warnin
g
s)
Te
m
peratures
Verify te
m
perature settings progra
mm
ed into the heating curve (See Part 11)
Connections
Check wire connections,
m
ake sure they are tight
Circuit
b
reakers
Check to see that the circuit
b
reaker is clearly la
b
eled, exercise circuit
b
reaker
Switch and Plug
Verify ON/OFF switch and convenience plug are
b
oth functional
S
m
oke and CO detector
Verify devices are installed and working properly, change
b
atteries if necessary
Co
mb
ustion Cha
mb
er
Vacuu
m
De
b
ris fro
m
Co
mb
ustion Cha
mb
er if Necessary
Co
mb
ustion Cha
mb
er
Check
b
urner tu
b
e, and co
mb
ustion cha
mb
er coils, clean according to
m
aintenance section of
m
anual
Spark Electrode
Clean with Scotch
B
rite pad, Set gap at 1/4" (see Fig 12-1 Part 12 in Trou
b
leshooting section)
Fla
m
e Pro
b
e
Clean with Scotch
B
rite pad, Check fla
m
e current (status
m
enu in Start-up Procedures) record high fire
(7-9 typical) and low fire (6-8 typical)
* NOTE : CONTINUE MAINTENANCE
B
EYOND THE 4TH YEAR IS REQUIRED ON A YEARLY
B
ASIS.
Date last co
m
pleted
Syste
m
Elect
r
ical
Cha
m
be
r
a
n
d B
urn
e
r
Содержание EL-110 LP
Страница 48: ...47 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 10 1 09 ...
Страница 49: ...48 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 1 14 10 ...
Страница 83: ...82 LP 172 REV 2 16 06 ...
Страница 84: ...83 LP 172 REV 2 16 06 ...
Страница 85: ...84 MAINTENANCE NOTES ...
Страница 86: ...85 MAINTENANCE NOTES ...
Страница 87: ...86 MAINTENANCE NOTES ...
Страница 88: ... 2003 2010 Heat Transfer Products Inc www HTproducts com LP 293 REV 01 06 10 ...