background image

JA10302020 

                                              

www.elitescreens.com

                        

U-00197 

8

 

Wall Installation 

Step 14: 

Measure the overall length and height of the frame and drill holes for the  top brackets. Line up the wall 

brackets  with the  drilled  holes  on  the installation  location  and  screw them  in  using  a  Phillips  screwdriver.  If  not 

installing  into  a  structural  wood  stud,  use  a  hollow  wall  anchor  then  screw  in  the  M5x50  wood  screws  with  a 

screwdriver. Make sure the brackets are leveled. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 15

: Position the fixed frame screen onto the top wall brackets as shown below and push down at the center of 

the top of the frame to secure. 

 

 

 

 

 

 

 

 

 

 

Model/Size 

X = Wall bracket distance 

X1 = Bracket hole distance 

Y = Top/Bottom Wall Bracket Height 

92’’ 

1100mm (43.30”) 

30mm (1.18”) 

980mm (38.58”) 

100’’ 

1200mm (47.24”) 

30mm (1.18”) 

1080mm (42.52”) 

110’’ 

1300mm (51.18”) 

30mm (1.18”) 

1210mm (47.64”) 

120’’ 

1400mm (55.12”) 

30mm (1.18”) 

1330mm (52.36”) 

125’’ 

1400mm (55.12”) 

30mm (1.18”) 

1400mm (55.12”) 

135’’ 

1500mm (59.06”) 

30mm (1.18”) 

1520mm (59.84”) 

150’’ 

1600mm (62.99”) 

30mm (1.18”) 

1710mm (67.32”) 

Model/Size 

X = Wall bracket distance 

X1 = Bracket hole distance 

Y = Top/Bottom Wall Bracket Height 

180’’

 

1000mm (39.37’’)

 

30mm (1.18”)

 

2080mm (81.88’’)

 

200’’

 

1100mm (43.30’’)

 

30mm (1.18”)

 

2330mm (91.73’’)

 

Don’t lock the screw to the bottom. 

 

Don’t lock the screw to the bottom. 

j. 

k. 

Diagonal Sizes of 150” and below use 4 x wall brackets

 

Diagonal Models above 150” require 6 x wall brackets

 

For Technical 

Support or an Elite 

Screens contact in 

your area, visit 

www.elitescreens.com 

 

Содержание EDGE FREE Aeon CineWhite UHD 2 Series

Страница 1: ...e UHD 2 which produces accurate colors in a light controlled environment which reproduces the content as the director intended In order for the CineWhite UHD 2 to maintain its projection qualities and...

Страница 2: ...Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a M4 4 b D5...

Страница 3: ...erfect right angles Tip The elbow joint d with the larger diameter holes should be on top Item Parts List 92 100 110 120 125 135 150 180 200 a Center Joints M4 bottom position 2 2 2 2 2 2 2 2 2 b Cent...

Страница 4: ...ves according to their corresponding lengths on each edge of the screen as shown below The short rods top bottom will overlap to secure a firm grasp in the middle areas Step 8 Carefully and gently pla...

Страница 5: ...er edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on both horizontal top bottom sides steps 3 4 Once all cent...

Страница 6: ...lat and wraps along the edge of the frame and reattach springs to the material Note Please make note of the yellow label and spring in the center of the frame This is an indicator to start the screen...

Страница 7: ...ttach the vertical left right sides edge trim frames d using the elbow joints f and secure with four M4x4 screws m on all corners Step 2 Step 12 Install the angle cover n on each corner of the frame u...

Страница 8: ...all bracket distance X1 Bracket hole distance Y Top Bottom Wall Bracket Height 92 1100mm 43 30 30mm 1 18 980mm 38 58 100 1200mm 47 24 30mm 1 18 1080mm 42 52 110 1300mm 51 18 30mm 1 18 1210mm 47 64 120...

Отзывы: