Elite Screens EDGE FREE Aeon CineWhite UHD 2 Series Скачать руководство пользователя страница 7

JA10302020 

                                              

www.elitescreens.com

                        

U-00197 

7

 

Connect edge trim frames (

e/f

) together using the 

M4

 

center joint (e) 

and secure with four of the 

M4x4 screws (m)

 

as show in 

Step 1

. Repeat for other side. 

Once both top and bottom edge trim frames have been connected, attach the vertical (left/right) sides edge trim 

frames (

d

) using the 

elbow joints

 (

f

) and secure with four 

M4x4 screws 

(

m

) on all corners, 

Step 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 

 

 

Step 12

: Install the 

angle cover

 (

n

) on each corner of the frame using the 

M4x4 screws (m)

Note: The angle cover screws holes align with the screw holes on the elbow joint.  

 

 

 

 

 

 

 

Step 13

: Install the

 springs (q) 

in each middle area to further support the bezel trim edge frame.

 

 

 

 

 

 

 

 

e. 

m

1

 

2

 

2

 

2

 

2

 

f. 

m

n. 

Tear off the double-sided tape.

 

q. 

Содержание EDGE FREE Aeon CineWhite UHD 2 Series

Страница 1: ...e UHD 2 which produces accurate colors in a light controlled environment which reproduces the content as the director intended In order for the CineWhite UHD 2 to maintain its projection qualities and...

Страница 2: ...Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a M4 4 b D5...

Страница 3: ...erfect right angles Tip The elbow joint d with the larger diameter holes should be on top Item Parts List 92 100 110 120 125 135 150 180 200 a Center Joints M4 bottom position 2 2 2 2 2 2 2 2 2 b Cent...

Страница 4: ...ves according to their corresponding lengths on each edge of the screen as shown below The short rods top bottom will overlap to secure a firm grasp in the middle areas Step 8 Carefully and gently pla...

Страница 5: ...er edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on both horizontal top bottom sides steps 3 4 Once all cent...

Страница 6: ...lat and wraps along the edge of the frame and reattach springs to the material Note Please make note of the yellow label and spring in the center of the frame This is an indicator to start the screen...

Страница 7: ...ttach the vertical left right sides edge trim frames d using the elbow joints f and secure with four M4x4 screws m on all corners Step 2 Step 12 Install the angle cover n on each corner of the frame u...

Страница 8: ...all bracket distance X1 Bracket hole distance Y Top Bottom Wall Bracket Height 92 1100mm 43 30 30mm 1 18 980mm 38 58 100 1200mm 47 24 30mm 1 18 1080mm 42 52 110 1300mm 51 18 30mm 1 18 1210mm 47 64 120...

Отзывы: