Edge Frame Projection Screen
User’s Guide
Rev.10252019MZ
11
3.
After properly aligning all trim pieces, carefully remove trim piece
A
(see Figure 3 below). Remove the
inside backing of the tape and place the trim piece in its original position on the frame. Repeat this step
for the remaining trim pieces in the following order: B-C-D-E-F.
4.
After the bezel trim has been installed, place a
corner sleeve
(M)
on all four corners. Begin by
aligning and adjusting the corner sleeve through the front of the screen. Make sure the corner sleeve
completely wraps the edge of the bezel trim. This should cover any corner gaps.
Once all corner sleeves have been snapped into each corner of the frame, it is ready to be installed.
Diagonal Size Note:
The Diagonal Size of the 100” &120” models before and after installing the edge trim strip.
101” comparison
Front side
After installing the trim strip
Before installing the trim strip
A
B
F
C
D
E
Back side
Figure 3
The
front side
of the frame with trim pieces attached.
Corner gap
will be
covered by
the
corner
sleeve (N).
White area
signifies
corner gap.