background image

 

User manual 

AR2

 

(Screw adjustment type)

 

 

Rev. V210929DT

 

Elite Screens China Corp.

 

11 

 

Edge trim Installation 

1. 

Place the 

Edge trim 

(D) on the four sides of the frame installed with the screen material. (Note: 

the 

edge trim 

affixed with LOGO is installed on the bottom frame right of the screen, and the side 

affixed with product label on the back of the screen is the bottom frame.) 

2. 

Place all the trim pieces along the edge of screen material Adjust the trim so that the top and 
bottom trim pieces are touching and show no gaps in the center. Then Align the 

M3x8 screw 

(G) 

with the A & B holes as below picture shown. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Edge trim 

(D)

 

 

Assembly section diagram of edge trim

 

M3x8 screw (G) 

Screen material

 (O) 

Verify that product labels are attached 

Decorate the trim for the bottom frame 

Содержание AR2 Series

Страница 1: ...User manual AR2 fixed frame series Screw adjustment type Rev V210929DT Elite Screens China Corp...

Страница 2: ...he screen s surface 3 Gently wipe the screen with a lightly moistened white lint free cloth with water or with a neutral detergent mixed with water Attention 1 Don t touch the screen material to avoid...

Страница 3: ...lbow joints x 8 B Horizontal frame x 2 C Left Right vertical frame x 2 D Edge trim x 4 E Sliding nut x 4 F Wall bracket x 4 Installed in the frame already G M3x8 screw x 20 H M5x8 screw x 40 I M5x50 S...

Страница 4: ...n at both ends of the Horizontal frame B as shown in the figure Reminder please place the frame in a relative position before assembling to avoid scratching the frame caused by collision during assemb...

Страница 5: ...9DT Elite Screens China Corp 5 3 Make sure all four corners are properly in place to form a perfect square then fasten the four angles with the M5x8 flat head screws H Four corners join correctly to f...

Страница 6: ...th a suitable weighted object or hand pressure Cannot press and crush the screen material face down and two people hold the other end rolled up end clockwise slowly rotate the screen Figure 2 3 Lay th...

Страница 7: ...o long Adjustment bars Q 1 2 on the fiberglass rod of the short side of the screen material and two short Adjustment bars Q 3 4 5 6 on the fiberglass rod of the long side of the screen Installation di...

Страница 8: ...y and gently place the assembled frame on top of the screen material In order to avoid puncturing the material do not allow the angled edge of the frame to come in direct contact with the screen 7 Ens...

Страница 9: ...s two people should insert the M4x40 screw J through the frame hole and screw it on the adjustment bar Q for two turns according to the sequence of 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 1...

Страница 10: ...n the screen surface it can be restored to flat surface by adjusting the tightness of the screws Two persons screw the screws on the adjustment bar 2 turns in sequence Screen material O M3 Hex Key K A...

Страница 11: ...and the side affixed with product label on the back of the screen is the bottom frame 2 Place all the trim pieces along the edge of screen material Adjust the trim so that the top and bottom trim pie...

Страница 12: ...has been installed screw off A screw on edge trim about 2mm gap then place a corner cover Q on all four corners final screw up the A screw Buckle two Edge trim D on the frame and overlap in the frame...

Страница 13: ...r installation Because the screen material of this product is ambient light rejecting material only suitable for ultra short throw projector installation schematic diagram is as follows Note Each proj...

Страница 14: ...or and place the view area to confirm the position of the screen according to the picture of the projector use a level to confirm whether the scree is level and then draw benchmark marking lines along...

Страница 15: ...cated 1 Drill holes at four points A B C and D 2 And install anchors at four point hole 3 Fasten the screw on the anchors and keep the screw 1cm away from the wall 4 Two people lift the screen first c...

Отзывы: