background image

 13 

3. 

Slide 2 bolts into the bottom of each glazing bar and 3 bolts (only 1 if 
greenhouse to be sited on soft ground) into the free end of each built 
in base section. Attach the 2

nd

 (of 2) bolt in the glazing bar to the hole 

in the door end cill, but do not put a nut on yet. Remember, the door 
end glazing bars are 95 mm longer than the rear end ones and do not 
sit on top of the base (as the rear end glazing bars do), they go down 
the side of the base and attached to the bottom cill. 

 

4. 

Attach the rectangular plate (with 3 holes) to the 2 bolts inserted in the 
glazing bars and the last bolt inserted into the built in base ensuring 
that the glazing bar is tight down into the angle of the door end cill. 
Attach the door end diagonal angle to the top bolt of the rectangular 
plate. The 2 unoccupied bolts in the built in base sections will be used to anchor the green-
house to the floor, and attach the corner bracket. 

 

5. 

Slide 2 bolts into the top of each glazing bar. The last bolt locates in the hole in the roof 

 

corner bar, do not put a nut on yet. 

 

6. 

Attach the main door track support (shaped like a letter ‘Z’ to be found with the door panels, 

 

packet marked door) to the two bolts that secure the glazing bars to the corner bars. 

(Key 

 

Point). 

This ‘Z’ shaped bar must be fitted with the two outside slots facing upwards (as illus-

 

trated) 

not

 downwards. 

(Key Point).

 

 

7. 

The two short horizontal angles attach to the 

top bolt 

in the 

 

eave gusset plate and the vertical glazing bars. 

 

8. 

When this has been achieved tighten all nuts. 

 

9. 

Stand the frame up and bolt the door track to the main door 
 track support and the small angle door track support by     in-
serting 4 bolts into the bolt slot of the door track. Position  3 of 
these through the 3 holes in the door track support   above the 
door opening. Viewed from the outside, the door slides centre to 
right. Position the door track in such a way that it is in line with 
the left hand glazing bar and right hand corner bar. The small 
angle door track support (which is to be fitted at the end of as-
sembly and before glazing) has 2 elongated holes at the top and 
is blank at the bottom. Attach one of the holes to the bolt slot at 
the back of the upper door track using the 4

th

 bolt, and then by 

using a self tapping screw, you can attach the blank end of the 
bar to the continuous screw groove on the corner bar. See door 
end assembly diagram

N.B. 

it is easier to fit the small door track support once the frames are 

joined together. You will need to drill a small hole (4mm) in the bottom of the small angle 
door track support to accommodate the self tapping screw. 

 

10.  Attach the corner bracket to the pre-inserted bolt closest to the end of the built in base, so that 

it is pointing downwards. If you are fitting your greenhouse onto soft ground, then do not fit 
the corner bracket yet. If you are on a patio, you will need to cut the corner bracket off level 
with the bottom of the built in base and slide extra bolts into the bolt channel of the built in 
base to be attached to the angle brackets (generally 1 every 2’). If  you are on soil, the corner 
bracket will go into the ground at general assembly. 

 

N.B.  

Please note carefully the correct position of the main door track support. The slotted holes at 

either end are facing skywards 

NOT

 downwards. (

Key Point).

 

Содержание 6'3" WIDE CRAFTSMAN

Страница 1: ......

Страница 2: ...2 ...

Страница 3: ...3 ...

Страница 4: ...diagonal angles 2 2 2 2 2 20 Door end glazing bars Taped together and marked Door End 2 2 2 2 2 21 Door end short horizontal angles 2 2 2 2 2 22 Door end diagonal angles 2 2 2 2 2 23 Small door track support 1 1 1 1 1 24 Door end cill Taped together 1 1 1 1 1 25 Ramp 1 1 1 1 1 26 Door end built in base cill 2 2 2 2 2 27 Corner bars in two packs 8 8 8 8 8 28 Door posts 2 2 2 2 2 29 Top door track 1...

Страница 5: ...R glass is fragile handle with care Protective eye glasses should be worn Gloves should be worn If your greenhouse is a powder coated there are a few 1 8 holes in the end of the bars These are jig holes for the process and have no bearing on construction Key Point When powder coated the sub frame assembly packages may slightly differ from the standard alloy finish Powder coated packages are wrappe...

Страница 6: ...ag but taped up with the casement stay separately g Two ridge plates h Two door wheels i One door guide j Small self tapping screws k 1 Large self tapping screw l 1 Spring washer m 1 Door keep 7 Roof bars 8 Glazing beading 9 One length of ridge 10 Two black brush draught excluders 11 Small angle brackets for anchoring down 12 Two door end plates with 3 holes for door end assembly For clear identif...

Страница 7: ...nds of the combined eaves gutter bar They must be so arranged that the inside of the angle in each case faces towards the middle of the house i e the elongated slot will be by the combined eaves gutter bar in one case and by the built in base in the other Key Point 7 Put nuts on bottom bolts and lightly tighten 8 Do the same with the other side frame assembly 9 Make sure that the glazing bars reac...

Страница 8: ...er eave bar 1 Built in base Glazing bars 1 if 4 long Side angle braces 1 if 4 long 2 if 6 long 2 if 6 8 10 or 12 long 3 if 8 long 4 if 10 long 5 if 12 long From the fitting list you will require nuts and bolts and glazing beading ...

Страница 9: ...ends of the bar These will later be used in the gen eral assembly for fixing the ridge eave and built in base to the ends Now secure the ridge gusset plate and eaves gusset plates by inserting bolts through the gusset plates and into the holes punched in the flange of the corner bar at the apex and eave 3 Attach the built in base to the side corner bars by inserting a bolt through the hole in the ...

Страница 10: ... N B It bolts only to the built in base and NOT to the corner bars If you are on a patio you will need to cut the corner bracket off level with the bot tom of the built in base and slide extra bolts into the bolt channel to be attached to the angle brack ets generally 1 every 2 If you are on soil the corner brackets will go into the ground at general assembly N B Roof Corner Bars are marked R on t...

Страница 11: ...11 REAR END ASSEMBLY ...

Страница 12: ...the inside v groove of the end glazing bars 1 Assemble the frame in exactly the same way as the rear end up to and including stage 3 of the rear end The difference with the door end is that instead of 1 long built in base piece the door end has 2 smaller pieces 1 either side of the door opening and 1 door end cill 2 Now engage the door end cill with the 2 built in base pieces by pushing the angle ...

Страница 13: ...lt the door track to the main door track support and the small angle door track support by in serting 4 bolts into the bolt slot of the door track Position 3 of these through the 3 holes in the door track support above the door opening Viewed from the outside the door slides centre to right Position the door track in such a way that it is in line with the left hand glazing bar and right hand corne...

Страница 14: ...14 DOOR END ASSEMBLY ...

Страница 15: ... the screw before assembling the doors Alternatively you could insert the screws into the screw eyes of the door panels before assembling the door this would have the effect of pre self tapping the panels prior to the assembly making assembly easier 4 Make sure all the angles are square and tighten all the screws 5 Fix each door wheel into position by pushing the bolt provided through the centre o...

Страница 16: ...andle is fitted to the infill panel on the door choose between 1st or 2nd panel down Position the handle centrally and mark the hole position Drill 7mm diameter holes 2 holes per door then fit the handle and secure with a nut and bolt ...

Страница 17: ... rail upper most The vent top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the v grooves in the vent side and vent top rails and trim to suit 4 Insert a bolt into each end of the vent side rail bolt slots put these bolts through the holes in the vent top and bottom rails add nuts and lightly tighten Check t...

Страница 18: ...18 ASSEMBLY OF GREENHOUSE UNIT ...

Страница 19: ...ghten up Place the side bracing angle onto the bottom bolt put a nut on and tighten up Key Point 5 The built in base attaches to the inside of the corner bar The bolt placed in the corner bar bolt slot at gable end assembly will slide down into the slotted hole at the end of the built in base The corner bracket attached at side frame assembly can now be attached to the gable end in a similar way t...

Страница 20: ...rs two glazing bars so two extra bolts per roof vent Key Point One each bar 12 Before bolting the bottom of the roof bar to the flange of the eave bar insert final nut and bolt to the eave bar as illustrated If your greenhouse is 10 5 or 12 5 long you have additional Tee Bar cantilever bracing at the eave 4 extra cantilevers for 10 5 6 extra for 12 5 Put an extra bolt into the 2nd and 3rd glazing ...

Страница 21: ...of vent allowing the casement stay to effectively close The slam bar can be adjusted later to facilitate good opening and closing of the roof vent Position the slam bar so that when the vent closes the two v notches are gutter side of the top edge of the slam bar i e be low the slam bar 14 Do not fit the door at this stage 15 The greenhouse is now ready for lifting on to its permanent base 16 If y...

Страница 22: ...gh the hole in the panel from the out side Reattach the ring bolt to the barrel on the inside and tighten Now attach the cam lever washer and screw to the door lock from the inside position of the door The lock will turn through 90 degrees both ways so you must ensure the cam when fitted is pointing skywards unlock position and horizontal locked position Now using a cropped head bolt attach the do...

Страница 23: ...lazing bar viewed from the inside and fix and angle bracket as shown in the picture below The bracket must be fitted at the same height as the door panel so that as the door moves left or right the bracket prevents the door from moving too far along the top door track Repeat at the bottom of the door HARD STANDING Having established the square of the greenhouse drill the patio or concrete in the r...

Страница 24: ...azing bars resting it on the two stainless steel band clips of the bottom pane Insert two more stainless steel band clips to hold it six inches from the bottom of the pane Bend the middle overlap clip upwards to support the glass Secure the pane by inserting another two stainless steel band clips four inches from the top of the pane 5 Repeat this all along this side of the greenhouse then repeat i...

Страница 25: ...GLASS 5 573 x 100 x 4mm GLASS OVER UNDER LOUVRE 1 610 x 140 x 3mm N B Louvre does not sit on the built in base it must be sandwiched between the 610 x 140 and 610 x 610 LENGTH A B A 24 X 24 610 X 610 mm 4 5 26 4 B 24 X 18 610 X 457 mm 6 5 34 4 8 5 42 4 10 5 50 4 12 6 58 4 ...

Страница 26: ...p muntin see diagram below The next pane sits on top of the P V C overlap muntin and is clipped in as normal 6 The roof panes have a P V C spacer Fit 1 roof P V C spacer to the top edge of each roof panel except where a vent is installed Slide the glass with spacer under the ridge as far as it will go and then lower into the recess in the combined gutter eaves bar N B Spacers and muntins will be f...

Страница 27: ...us 1 off Ref 18 1 off 610 x 140 3 Louvre Frame and Glass 5 off 100 x 573 YOUR GREENHOUSE IS NOW COMPLETE MODEL 9 18 19 61 62 63 4 5 x 6 3 12 3 4 4 1 1 6 5 x 6 3 16 3 4 4 1 1 8 5 x 6 3 19 3 4 4 1 1 10 5 x 6 3 23 5 4 4 1 1 12 5 x 6 3 27 5 4 4 1 1 Code Width mm Length mm 9 610 1197 18 610 610 19 610 457 ...

Страница 28: ...28 ELITE 1803 ...

Отзывы: