background image

04PREMG0604-V1

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

6x4 Greenhouse 

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) 

Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

04PREMG606-V1

6x6 Greenhouse 

04PREMG0608-V1

6x8 Greenhouse 

04PREMG0610-V1

6x10 Greenhouse 

Refer to the instructions pages for you specific product code

Содержание 04PREMG0604-V1

Страница 1: ...on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment Wh...

Страница 2: ...your building MADE IN GREAT BRITAIN G1 G2 G3 G4 G5 G6 G7 G8 Nail Bag b 13 18 17 16 14 15 19 20 21 Door Handle QTY2 Mortice Lock Key Plate Flush Hinge QTY 3 L Bracket QTY 2 Butt Hinge QTY 4 Casement St...

Страница 3: ...eat this process with each of the panels until fully glazed Step 2 Glazing Panels Window Side Glazing 6x4 x2 G4 6x6 x3 G4 6X8 x4 G4 6X10 x5 G4 Step 1 Glazing Window Door Place flat onto a firm and lev...

Страница 4: ...and level base ensuring that there are no objects that could damage the glazing Carefully slide glazing into place and secure using 1x glazing clips and 2x20mm screws per glazed side Repeat this proce...

Страница 5: ...plate to the opposite door using the screws provided 16 15 Fix the door handles and the metal bar spindle using 8x30mm screws Ensure the mortice lock closes correctly If not remove lock and turn the...

Страница 6: ...of panel onto the building and secure to the gables and the roof support bar using 8x50mm screws as shown in the diagram 8x50mm Screws Pre drill hole 50mm screw Rest the second roof panel onto the bui...

Страница 7: ...tep 12 Step 13 Fix the fascias cover trims and finials to the building using 24x30mm screws 24x30mm Screws Pre drill hole 30mm screw Fix the roof trim to the underside of the roof secure in place usin...

Отзывы: