
SCHEDULED MAINTENANCE
Wash down machine after every sweeping
shift. See Daily Washdown procedure later in
this chapter.
DAILY SERVICE CHECKLIST
The numbers below correspond with the locations on
Figures M-1, M-2, M-3 and M-4.
Service after every shift or 10 hours
1
Check Engine Oil Level - Oil Pressure Gauge
2
Check Hydraulic Oil Level - Sight Tube
3
Check Radiator Coolant Level
4
Check Tire Inflation Pressure
5
Inspect Pre-Cleaner - Air Filter (Accessory)
6
Drain Water Separator - Engine
8
Wash Down Entire Machine - Flush Out Lower
Conveyor Roller
9
Check Windshield Washer Fluid Level
10 Grease Main Broom Bearings (2)
11 Grease Main Broom Pulley & Cylinder (2)
13 Grease Lower Conveyor Roller Bearings (2)
14 Grease Upper Conveyor Roller Bearings (2)
15 Grease Dirt Shoe Pivot Plate (6)
16 Grease Dirt Shoe Pivot (2)
17 Grease Sprung Guide Wheel
18 Grease Main Broom Cam Follower (2)
19 Inspect Water Filter
20 Check backup alarm operation
M-1
MAINTENANCE
MAINTENANCE
Содержание Pelican P
Страница 1: ...P e l i c a n P OPERATORS MANUAL...
Страница 2: ......
Страница 4: ...Printed in U S A Copyright 2007 Elgin Sweeper Company...
Страница 6: ...ii...
Страница 22: ...SAFETY S 12...
Страница 58: ...MAINTENANCE M 4 Pelican P Top View Scheduled Maintenance Items Figure M 1...
Страница 59: ...M 5 MAINTENANCE Pelican P Front End Scheduled Maintenance Items Figure M 2...
Страница 60: ...MAINTENANCE M 6 Pelican P Rear End Scheduled Maintenance Figure M 3 Pelican P Guide Wheel Figure M 4...
Страница 66: ...NOTES MAINTENANCE M 12...
Страница 97: ...SP 31 SERVICE PROCEDURES Belt Repairs Figure SP 25...
Страница 104: ...NOTES SERVICE PROCEDURES SP 38...
Страница 108: ...TROUBLE SHOOTING T 4...
Страница 111: ......