PURELAB 7000 - US Operator Manual
ELGA
Page 10
PURELAB 7000 - US MANU40676 Version 02 - 02/16
Step 13 - Periods of operation (screen 030)
For efficiency and to reduce the likelihood of heat build up
the normal operational hours can be selected.
During OFF periods the unit will automatically re-circulate
water for a period of 10 minutes every two hours to
maintain water purity within the distribution loop.
1.
PRESS
to edit night service start
OR
PRESS
✔
to proceed to Step 14.
2.
PRESS
to increase or
to decrease time in
increments of 30 minutes.
3.
PRESS
to step to night service end.
4.
PRESS
to increase or
to decrease time in
increments of 30 minutes.
5.
PRESS
to enter times.
6.
PRESS
✔
.
Note:
Night service will only be operational if Continuous
Operation is not enabled.
Step 14 - Operational days selection (screen 031)
Select the days that the PURELAB 7000 is required to
operate by highlighting the relevant box.
Monday = 1, Sunday = 7
1.
PRESS
to enter selection screen
OR
PRESS
✔
to proceed to Step 13.
2.
PRESS
to highlight box 1 (
= Monday
enabled)
OR
PRESS
to box (2).
Note:
A highlighted box indicates that the unit will be
operational on that day between the times set in
Step 13.
3.
REPEAT, Step 14 - 2, to select further operating
days or PRESS
until the
✔
appears.
4.
PRESS
✔
.
Note:
During the selected off periods the unit can be
restarted by pressing PROCESS. A few minutes
operation should be allowed before use to allow
optimum water purity to be reached.
Setting period of operation
Day selection screen
Содержание PURELAB 7000 - US
Страница 1: ...PURELAB 7000 US Operator Manual...
Страница 2: ......