Resistance Welder MULTISPOT MI-100
Installation
24
5.3 Assembling
the
balancer
Fig.19: Balancer checklist
1.
Unpack the balancer.
2.
Check balancer components for damage. Use the checklist
provided (Fig.19) to check whether you have all the parts.
Balancer
Guide rollers with locking pin and ring
Vertical pipe and crossbar pipe
Replacement carabine hook
Four M8 bolts with two nuts and washers each
Mounting
instructions
Fig.20: Vertical pipe
3.
Mount the vertical pipe using four M8 bolts
(Fig.20,
see separate operating and mounting instructions).
Fig.21: Crossbar pipe
4.
Mount the crossbar (Fig.21,
see separate mounting
instructions). Proceed as follows:
Mount and screw down stopper (Fig.21/1).
Insert crossbar pipe into guiding element. Secure with
locking pin (Fig.21/2).
Hang up spring balancer and
secure
(see operating
instructions for spring balancer).