D0622A
0107
3
9
Notice
Date
Page
01201138
INSTRUCTION
HANDBOOK
Mechanical installation
Setting of the "Gripsol" bolsters
Preparation of the ground and machine :
- Degrease carefully the ground and the soles of the machine.
Preparation of the "Gripsol" bolsters :
- Soak the bolsters in hot water during 5 minutes, then let them in open air for 3 to 4
minutes.
- Then unstick the protective fi lm on the two adhesive sides.
Setting the "Gripsol" bolsters :
- Place each bolster (G) at its respective location (see drawing). Check that the bolster
projects inside the soles and heave successively each bearing of the machine.
Putting the machine into service
- Waiting time : Before putting the machine into service, it is necessary that each bearing
is well fi xed by crushing of the upper layer of
"Gripsol"
and that the lower layer has
penetrated in the porosity of the ground.
For an ambient temperature of 18 °C (65 °F), the crushing time is two hours.
Electrical safety device :
- As
"Gripsol"
is a very good electric insulating material, the earthing of the machine is
compulsory.
To displace the machines sealed with "Gripsol" bolsters, you just have to heave the machine
and pull off the "Gripsol" bolsters.
9. Installation
Содержание Washer-extractors WS4250H
Страница 2: ... ...
Страница 41: ...1009 7 9 Notice Date Page 01201138 INSTRUCTION HANDBOOK 9 Installation This page ist left blank on purpose ...
Страница 67: ...0807 33 9 Notice Date Page 01201138 INSTRUCTION HANDBOOK 9 Installation This page ist left blank on purpose ...
Страница 145: ...0107 76 11 Notice Date Page 01201138 INSTRUCTION HANDBOOK This page ist left blank on purpose 11 Machine operation ...
Страница 167: ... ...
Страница 168: ...www electrolux com laundrysystems Share more of our thinking at www electrolux com ...