19
G
G..4
4..1
1
A
AD
DJJU
US
ST
TM
ME
EN
NT
T O
OF
F T
TH
HE
E M
MIIN
NIIM
MA
AL
L D
DIIS
ST
TA
AN
NC
CE
E
B
BE
ET
TW
WE
EE
EN
N T
TH
HE
E G
GL
LA
AS
SS
S A
AN
ND
D T
TH
HE
E U
UP
PP
PE
ER
R
P
PL
LA
AT
TE
E ((m
mo
od
de
ellss e
eq
qu
uiip
pp
pe
ed
d o
on
nllyy))
If 0 chock: H = approximately 13mm
If 1 chock: H = approximately 24mm
If 2 chocks: H = approximately 35mm
If 3 chocks: H = approximately 46mm
If 4 chocks: H = approximately 57mm
NOTE!
THE NUMBER OF CHOCKS IS GIVEN STARTING
FROM THE TOP (SEE EXAMPLE)
• 4
4 C
CH
HO
OC
CK
KS
S
• 2
2 C
CH
HO
OC
CK
KS
S
G
G..5
5
W
Wo
orrkkp
plla
acce
e
All the laws, regulations and directives in force in the place of
installation regarding the following must be observed.
• Correct lighting of workplaces.
• Safety in the workplace, accident prevention.
• Compulsory signs and signals.
• Hygiene.
• Work zones and separation of paths for hygienic purposes.
• Fire prevention.
• Low air pollution emissions.
G
G..6
6
U
Un
np
pa
acckkiin
ng
g
IIM
MP
PO
OR
RT
TA
AN
NT
T
Immediately
check
for
any
damage
caused during transport. Inspect the pack-
aging before and after unloading.
• The forwarder is responsible for the goods during transport
and delivery.
• Make a complaint to the forwarder in case of visible or
hidden damage.
• Specify any damage or shortages on the dispatch note.
• The driver must sign the dispatch note: the forwarder can
reject the claim if the dispatch note is not signed (the
forwarder can provide the necessary form).
• For hidden damage or shortages becoming apparent only
after unpacking, request the forwarder for inspection of the
goods within and no later than 15 days after delivery.
• Keep all the documentation contained in the packaging.
• Remove the packaging. Take care when unpacking and
handling of the appliance to not cause any shocks on itself.
G
G..6
6..1
1
F
Fe
ee
ett iin
nsstta
alllla
attiio
on
n
G
G..7
7
E
Elle
eccttrriicca
all cco
on
nn
ne
eccttiio
on
n
W
WA
AR
RN
NIIN
NG
G
Refer to “
IIM
MP
PO
OR
RT
TA
AN
NT
T
Connection to the power supply must be
carried out in compliance with the regu-
lations and provisions in force in the
country of use.
• Make sure the system power supply is arranged and able to
take the actual current load and that it is executed in a
workmanlike manner according to the regulations in force in
the country of use.
• The plug must be accessible after positioning the appliance
in the place of installation. Make sure the plug is not crushed
by the appliance. A damaged power cable can overheat and
catch fire or cause a short circuit.
• Make sure the machine power supply voltage specified on
the data plate matches the mains voltage.
• Make sure that the socket has an efficient ground contact.
1
A
B
x4
2
A
B
x4
Содержание SPEEDELIGHT
Страница 1: ...SPEEDELIGHT E EN N Installation and operating manual Original instructions 595402601 2018 01 ...
Страница 2: ...2 I In ns st ta alllla at tiio on n d diia ag gr ra am m ...
Страница 3: ...3 EI Power cable length 2000 mm 78 74 EQ Equipotential screw ...
Страница 36: ......
Страница 37: ......
Страница 38: ...Electrolux Professional SPA Viale Treviso 15 33170 Pordenone www electrolux com professional ...