SOI/DT 2007-02 dmm
56/66
599 38 61-92
•
An example of drum balancing in the longest interval of time available
Phase Unbalance
rating Time-out
(sec)
1 0
60
2 1
120
3 2
60
4 3
90
5 1
120
6 2
60
7 3
90
•
An example of unbalancing after all FUCS phases have been performed
In this case, the spin (or pulse operation) is skipped.
1
2
3
4
5
6
7