background image

         

19

Pumping for remote control unit (AOFP201RU - 20 GN 1/1)

Liquid gas line 0.47" dia (12 mm)
Gas intake line 0.79" dia (20 mm)

Lay the copper piping, choosing the shortest route and avoiding

bends, elbows and vertical stretches as much as possible,
observing the following rules:
- in the horizontal stretches, the intake line must slope down to

the condenser unit at a gradient of not less than 2%.

- air traps must be installed before all upward stretches of the

intake line (every 6.6 feet/2 metres).

- insulate the intake line with suitable lagging (minimum

thickness 0.35 in / 9 mm).

- you are advised to install the remote unit at a distance of no

more than 49.21 feet/15 m. from the appliance, and with a
maximum height difference between unit and appliance of 5
m.

 IF YOU EXCEED THESE DISTANCES,  PLEASE CONSTULT

YOUR CONTACTOR FOR INFORMATION ON INSTALLATION.

• Install the following devices on the gas liquid line, in the

following order: a filter, a suitably sized dehydration (dryer)

device, a liquid flow indicator and a solenoid valve.

B.1.6 ELECTRICAL CONNECTION

In the case of equipment with remote units, the connection must
be made separately for the unit and the appliance.
The 

AOFP201RU

 models are all remotely controlled and run on

three-phase power supply (208V, 3ph, 60Hz).
The 

AOFP061U, AOFP061TU, AOFP101U, AOFP102U

 models

run on three-phase power supply (208V, 3ph, 60Hz).

 

CAUTION:

Connection to the electrical mains must be carried out in
accordance with current regulations and the standards re-
quired by the National Electric Code (NEC), known as NFPA 70.

Before connecting, 

make sure that:

- The appliance must be hard wired to incoming power supply.
- In order to protect the appliance from possible leakages,

overloads or short-circuits, install a circuit-breaker or fused
disconnect switch between the power supply cable and the
main power source.

- After making the connection and with the appliance running,

check that the rated voltage level does not fluctuate by  ± 10%.

Note: 

In the  models set up for operation with remote units,

make the electrical connection to the condenser unit and solenoid
valve as illustrated in the wiring diagram enclosed with the

appliance.
The wire connection must be sized with correct cable for the
amperage.  Insert the wires and clamp them with the special

cable clamp.  Correctly connect each wire to the corresponding
terminal.

The manufacturer will accept no liability for any damage or
injury resulting from the violation of the above rules or of the
binding electrical safety standards in the country where the

appliance is used.

B.1.7 PUTTING THE LINES UNDER VACUUM AND CHARGING

WITH REFRIGERANT GAS (FOR REMOTE UNITS)

B.1.7.1 Leakage test

- Wash out the intake pipes with pressurised dry nitrogen.
- Connect a nitrogen cylinder to the high and low pressure
connectors, and connect to a pressure gauge (using a  

“T”

union).  Charge the high and low pressure lines with gas until

they reach a pressure of about 217.56 psi/15 bar.  Shut off the

cylinder cock and, after at least an hour, check that the pressure
has not dropped to below the previous reading level.

B.1.7.2 Vacuum

- Empty the circuit manually by opening the connectors.
- Connect the pipes to a vacuum pump, preferably a two-stage

model with a vacuum gauge and high and low pressure
connectors.  Take the vacuum level to equal to or lower than
70Torr (0.093bar).  On reaching this level, stay at the same level

for about 30 minutes and then proceed with charging the unit as
follows:

B.1.7.3 Charging with refrigerant

- Charge the high and low pressure lines with liquid refrigerant
for R404A until the pressure between the cylinders and the

circuit is balanced (The initial charge of fluid is about 20 to 30%
of the total charge).
- At this point, shut off the high pressure line, start up the

compressor and charge with gas slowly until the bubble in the
liquid indicator disappears.

 

CAUTION:

 the charging with refrigerant must be done by professionally

qualified personnel.

B.1.8 Checks to be made when starting up the appliance

- Before making the appliance operational, run a complete

manual cooling or blast chilling cycle.

- Use the liquid flow indicator to check that the circuit is sufficiently

charged.
If ok, proceed with start-up, or if not, complete the charging
following the instructions in § B.1.7.3.

- Using a digital thermometer, check that the temperature

reading on the control panel matches the thermometer reading.

- In condensing units, it is advisable to check the correct return

of oil to the compressor.  The check can be made in the
following way:

1. with the condensing unit turned off, make sure that the

oil window located on the compressor casing is filled to
at least 1/4 its height.

2. run a complete empty HARD CHILLING (BC) or

FREEZING (BCF) cycle;

3. turn the chiller off at the end of the cycle;

wait at least 15 minutes then check the oil level.  The oil

must be visible in the window on the oil casing; if not, add
oil until filled to at least 1/2 its height (only use oil with the
characteristics given on the compressor dataplate).

Содержание AOFP061U

Страница 1: ...nstallation of the condensation tray Page 14 B 1 3 2 Positioning the spacers Page 14 B 1 3 3 Positioning on the Cook Chill stacked units Page 15 B 1 3 4 Positioning the top Page 16 B 1 4 Draining the water Page 16 B 1 4 1 Manual draining Page 16 B 1 4 2 Automatic draining Page 16 B 1 5 Positioning appliances arranged for use with remote units and positioning of condensing units Page 18 B 1 6 Elect...

Страница 2: ...de practices BEFORESERVICING DISCONNETTHEELECTRICALSERVICE ANDPLACEAREDTAGATTHEDISCONNECT SWITCH TO INDICATE WORK IS BEING DONE ON THAT CIRCUIT NOTICE CONTACTYOUR AUTHORIZEDSERVICECOMPANYTOPERFORMMAINTENANCEANDREPAIRS NOTICE Usinganypartsotherthangenuinefactorymanufacturedpartsrelievesthemanufacturerofallwarrantyand liability NOTICE Manufacturer reserves the right to change specifications at any t...

Страница 3: ...nd after installation Read the instructions in the manual carefully before carrying out anyoperationwhatsoeverontheappliance astheygiveimportant information about the standards and rules governing its installation and safe use Improper installation adjustment alteration service or maintenance can cause property damage injury or death Failure to observe the instructions in this manual when carrying...

Страница 4: ...s which require air movement WEARPROTECTIVEGLOVESWHENUNPACKING ANDINSTALLINGTHEAPPLIANCE Read these instructions carefully before attempting installation Installation and initial startup should be performed by a qualified installer Unless the installation instructions for this product are followed by a qualified service technician a person experienced in and knowledgable with the installation of c...

Страница 5: ...g it to avoid leaving glue stuck to the surface Should this happen remove the traces of glue with a non corrosive solvent rinsing it off and drying carefully It is advisable to go over all the stainless steel surfaces with a cloth coated with vaseline oil in order to form a protective film Use a pallet jack or fork lift truck to lift appliances Inserting the forks under the pallet lift the applian...

Страница 6: ...ng of the refrigerating unit components Never cover the condenser not even temporarily as this may jeopardise the operation of both the condenser and the appliance Should the appliance be installed in rooms where there are corrosive substances chlorine etc it is advisable to wipe over all the stainless steel surfaces with a cloth coated with vaseline oil to create a protective film The room temper...

Страница 7: ... screws screwing them into the mounting holes The spacers have the function of keeping the appliance a certain distance from the wall to allow the refrigerating unit elements to cool properly Failure to install the spaces will void warranty and any responsibility of the manufacturer B 1 3 3 Positioning of the Cook Chill stacked units If the AOFP061U blast freezer will be used to make a new a Cook ...

Страница 8: ... 4Positioningthetop If the AOFP061U chiller is not to be stacked on the Cook Chill unit order and fit the top kit code F880027 To fit the top follow the instructions given below making reference to the steps illustrated take the hinge and fit it to the top of the chiller externally on the left using the supplied M5X12 screws see picture A position the polysterol cover see picture B position the to...

Страница 9: ...AOFP101U and AOFP102U models periodic emptying of the liquid drain tray can be avoided by connecting the chamber drain located on the bottom of the appliance to a drainage system or by connecting a hose to the drain and running the water into a floor grate For AOFP201RU models periodic emptying of the liquid drain tray can be avoided by connecting the cell drain located on the evaporator tray to a...

Страница 10: ...THREMOTEUNITSANDPOSITIONINGOFCONDENSING UNITS Important theoperationmustbecarriedoutbyprofessionally qualifiedpersonnel Install the unit following all safety measures required for this type of operation Place the condenser unit in a well ventilated room a long way from heat sources If the remote unit is to be installed outdoors it must be protected against natural elements with a cover which must ...

Страница 11: ...r injury resulting from the violation of the above rules or of the binding electrical safety standards in the country where the appliance is used B 1 7PUTTINGTHELINESUNDERVACUUMANDCHARGING WITHREFRIGERANTGAS FORREMOTEUNITS B 1 7 1 Leakage test Wash out the intake pipes with pressurised dry nitrogen Connect a nitrogen cylinder to the high and low pressure connectors and connect to a pressure gauge ...

Отзывы: