background image

Revised July 29, 2019 

 

LX2160 Owner's Manual 

www.electro-mech.com  ·  800.445.7846 

 

Page 17 

MECHANICAL INSTALLATION 

This section of the manual describes options for installing shot clock cabinets.  If your 

scoreboard project includes customizations or requires other special mounting 

considerations, please contact Electro-Mech to request details specific to your project.  

If you have unique requirements and would like to change the position or size of our 

mounting hardware to accommodate them, we can probably help you out.  But we need 

to find out BEFORE we start building the cabinet.  Let your scoreboard sales rep know 

about any special needs as early in the process as possible. 

Additional Materials and Tools 

Most shot clock displays are installed on or near the structure supporting a basketball 

goal.  As illustrated below, each shot clock cabinet includes a set of mounting points in 

the back and a set of mounting points on either side (brackets and posts not included). 

 

These mounting points are simple and generic enough to accommodate a variety of 

techniques for hanging the display on assorted structures.  The rear mounting points 

accept 1/2-inch 13 bolts and are provided for mounting structures that can run behind 

the shot clock cabinet.  In some cases, it may be easier to attach support pieces to the 

sides of the shot clock cabinets.  The side mounting points accept 3/8-inch 16 bolts. 

Electro-Mech recommends you find a reputable sign installer with the equipment and 

experience to handle the work mentioned above.  If you are unfamiliar with sign 

installers in your area, contact your scoreboard sales rep for recommendations. 

Содержание LX2160

Страница 1: ...t of two displays The standard package includes a wired handheld switch assembly which is intended to plug into the control console used with the main basketball scoreboard Because Shot Time is linked...

Страница 2: ...com TABLE OF CONTENTS Best Practices for Personal Safety and Product Care 3 Product Specifications 5 Planning Your Scoreboard Installation 8 Electrical Installation 10 Mechanical Installation 17 Test...

Страница 3: ...in the packaging peel back the cardboard or other packing materials to expose the cabinet Make notes on the paperwork provided by the trucking company before accepting delivery If the damage appears t...

Страница 4: ...attempt to install or operate shot clocks outdoors or in a wet location Indoor shot clock displays are typically attached to the support structure behind basketball goals The cabinets include multipl...

Страница 5: ...structed from extruded aluminum channel and formed aluminum pieces The face and back sections are made from aluminum sheet material The face is finished with matte black enamel paint All other cabinet...

Страница 6: ...the main basketball scoreboard the standard LX2160 package does not include its own control console An Electro Mech MP basketball console of the type shipped with our LX series basketball scoreboards...

Страница 7: ...ts include mounting points along each side allowing a shot clock display to be supported by brackets bolted to the sides The side hardware is tapped for 3 8 inch 16 bolts Safety Listing Support and Wa...

Страница 8: ...indoor facilities it is important to make sure people cannot accidentally or intentionally interfere with the shot clock displays or cables connected to them For example indoor shot clock cabinets are...

Страница 9: ...t clock model Before purchasing materials running cabling etc you should verify with the factory that you have the right documentation for your unique project It is possible that a government agency s...

Страница 10: ...okups for power and data will happen after the mechanical installation But it is wise to plan for key pieces of the electrical installation prior to physically mounting the cabinets The standard confi...

Страница 11: ...flat head screwdrivers a knife etc Electro Mech recommends you find a reputable sign installer or electrician with the tools and experience to handle the type of work mentioned above If you are unfami...

Страница 12: ...nted on a wall externally mounted on bleachers or positioned anywhere else that is convenient Choose a location that is protected so that the junction boxes and cables are not likely to be stepped on...

Страница 13: ...lls for a more complicated cabling plan it is best to work out the details with your scoreboard sales rep prior to installation Stereo Plug At each shot clock display data enters the cabinet through a...

Страница 14: ...hould be soldered to this terminal The terminal that extends further from the center of the plug body connects to the ring of the plug Solder the red wire here The strain relief tabs are connected to...

Страница 15: ...oards with stat panels and its own data cable Daisy Chaining Another simple case is when multiple displays are always run in synchronization from a single control console There are two ways to run cab...

Страница 16: ...ins from one console In the illustration above two scoreboards are linked through Control Console A because both patch cables are plugged into data ports on the back on the console If activities in th...

Страница 17: ...t clock displays are installed on or near the structure supporting a basketball goal As illustrated below each shot clock cabinet includes a set of mounting points in the back and a set of mounting po...

Страница 18: ...ws will discuss how to connect the control console and test the system Connections at the Control Console The standard control console packaged with this scoreboard system is powered through a typical...

Страница 19: ...displays should begin showing data within a few seconds Use the three button handheld device to reset blank and restore the shot clock time The SHOT CLOCKS button on the control console should allow...

Страница 20: ...scoreboard model for outdoor scoreboards you can find the model number printed on a metal plate attached to the back of the scoreboard cabinet near where the power enters For indoor scoreboards the mo...

Страница 21: ...ss than three business days Electro Mech maintains a supply of common parts for immediate shipment Some customers choose to purchase new parts for immediate use and will later send old parts back to u...

Страница 22: ...All serviceable parts are located behind the detachable aluminum face of each shot clock display If your shot clocks include ScoreLink RF receiver units they will be accessible on the face just below...

Страница 23: ...emoving an LED Assembly Step By Step Disconnect power to the shot clock cabinet before performing any service work Remove the self tapping screws holding the face to the cabinet leaving for last one o...

Страница 24: ...pply module with the AC line side passing through a 5 amp fuse along the way The fuse is AG style and should only be replaced with fuses of this same style and rating Power connections are made along...

Страница 25: ...w lists the names and purposes of the various connectors on the LX11 Driver LX11 Driver Functions Connector Function J2 Data In From ScoreLink J3 Data Out To Data Output Port J4 Word 1 Low Shot Clock...

Страница 26: ...Parts or Equipment will be new or serviceably used comparable in function and performance to the original Parts or Equipment and warranted for the remainder of the warranty period Purchasing addition...

Страница 27: ...ut not limited to wireless systems copper wire fiber optic cable conduit or trenching for the purpose of overcoming local site interference Any statements regarding products or services made by salesm...

Отзывы: