![Electro Industries Nexus 1262 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/electro-industries/nexus-1262/nexus-1262_installation-and-operation-manual_2379711028.webp)
Electro Industries/GaugeTech
Doc # E151701
2-4
2.3: Advanced Measurement Functionality
2.3.1: Advanced Revenue Billing Capability
The Nexus® 1262/1272 device is a full four-quadrant power meter with accuracy of within 0.06% of
reading. Energy measurements include: kWh Delivered & Received, kVARh Delivered & Received,
kVAh, kVARh, kWh in each quadrant and Total kVAh. The meter measures instantaneous power and
provides multiple, simultaneous demand measurements, including time-stamped maximum and mini-
mum readings.
Q
Time of Use
The Nexus® meter’s Time of Use functionality offers the following standard capabilities:
•
8 TOU Schedules
•
Bidirectional Consumption and Demand
•
4 Seasons/Year
•
20 Year Calendar
•
Prior Month and Prior Season Readings for each Schedule
•
Present Month and Present Season Readings for each Schedule
•
Total to Date Readings for each Month
•
Total to Date Readings for each Season
•
Cumulative and Continuous Cumulative Demand
Q
Load Aggregation/ Universal Metering
Using standard pulse inputs, the Nexus® 1262/1272 meter can count pulses from external meters
and accumulate usage. The pulse inputs can be used to totalize electrical usage and utility values,
such as water or gas use data. Readings include:
•
8 Pulse Inputs
•
Individual Accumulating Registers
•
4 Totalizing Registers
•
Totalize with Nexus® meter kWh Readings
Q
Multiple Demand Windows
The Nexus® 1262/1272 meter simultaneously monitors four demand structures. The unit offers:
•
Block Window Demand
•
Rolling Window Demand
•
Predictive Demand
•
Thermal Demand
•
Interval Length from 1 second to many hours
•
Up to 15 Sub-Intervals
•
End of Interval Pulse Output (with Optional 4IPO Internal KYZ capability)
•
End of Interval Pulse Input
Q
Time Stamped Max/Min Demands
The unit gathers Time Stamped Max/Min Demands for all power values. Each of the following
values is date/time stamped:
•
kW Demand, Delivered & Received, Max/Min
•
kVAR Demand, Delivered & Received, Max/Min
•
kVAR Coincident with kW Demand
•
kVA Demand, Max/Min
•
Amps Demand, Max/Min
•
Voltage Demand Max/Min
Содержание Nexus 1262
Страница 1: ... The Leader in Power Monitoring and Control The Leader in Power Monitoring and Control ...
Страница 2: ......
Страница 4: ...Electro Industries GaugeTech Doc E151701 ...
Страница 8: ...e Electro Industries GaugeTech Doc E151701 iv ...
Страница 39: ...Electro Industries GaugeTech Doc E151701 3 5 3 4 Nexus 1262 1272 Meter Programmable Display Navigation Map ...
Страница 52: ...e Electro Industries GaugeTech Doc E151701 4 8 ...
Страница 115: ...9 10 Navigational Map for P60N Touch Screen External Display Electro Industries GaugeTech Doc E151701 9 17 ...
Страница 130: ...Electro Industries GaugeTech Doc E151701 10 14 ...
Страница 133: ...Electro Industries GaugeTech Doc E151701 11 3 Fig 11 1 Form 9S Wye no PTs 3 CTs ...
Страница 134: ...Fig 11 2 Form 9S Wye 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 4 ...
Страница 135: ...Electro Industries GaugeTech Doc E151701 11 5 Fig 11 3 Form 9S 4 Wire Delta no PTs 3 CTs ...
Страница 136: ...Fig 11 4 Form 9S 4 Wire Delta 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 6 ...
Страница 139: ...Fig 11 7 Form 9S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 9 ...
Страница 140: ...Fig 11 8 Form 9S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 10 ...
Страница 141: ...Fig 11 9 Form 36S 2 5 Element Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 11 ...
Страница 142: ...Fig 11 10 Form 36S 2 5 Element Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 12 ...
Страница 143: ...Fig 11 11 Form 45S Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 13 ...
Страница 144: ...Fig 11 12 Form 45S Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 14 ...
Страница 145: ...Fig 11 13 Form 45S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 15 ...
Страница 146: ...Fig 11 14 Form 45S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 16 ...
Страница 150: ...Electro Industries GaugeTech Doc E151701 11 20 ...
Страница 154: ...Electro Industries GaugeTech Doc E151701 12 4 Fig 12 5 Switchboard Meter Side View ...
Страница 168: ...Electro Industries GaugeTech Doc E151701 12 18 ...
Страница 176: ...Electro Industries GaugeTech Doc E151701 13 8 ...
Страница 186: ...Electro Industries GaugeTech Doc E151701 A 2 ...
Страница 187: ...Electro Industries GaugeTech Doc E151701 A 3 ...
Страница 188: ...Electro Industries GaugeTech Doc E151701 A 4 ...
Страница 189: ...Electro Industries GaugeTech Doc E151701 A 5 ...
Страница 190: ...Electro Industries GaugeTech Doc E151701 A 6 ...
Страница 206: ...Electro Industries GaugeTech Doc E151701 C 14 ...