05/21/2009 3 

BI501 

zone and the installer selects one of four zone capacity sizes.  When dialing in the size closest to the zone 
Btu/h capacity, the zone controller “smarts” only allows the appropriate boiler stage which can handle that 
capacity.  Also this is additive if more than one zone calls at any one time – order EB-ZTS-1. 

3.

 

Two temperature system with unbalanced zones

 – if the application includes zone one requiring high 

temperature (fin tube, air handler, etc.) and the remaining zones are radiant floor low temperature, this zone 
controller (EB-ZTS-1) will automatically raise the output of the high temperature zone.  This is a priority 
arrangement, zone 1 holds off the other zones while the high temperature output is heating.  If at the end of 
the high temperature zone there is a call on any of the low temperature zones (up to three plus slave 4), 
there will be a pump only function until the outlet temperature drops below the front panel dial setting. 

 

Field zone controller installation

 – the above mentioned zone controller board is installed within the 

basic cabinet.  

However

, the zone controller board must communicate with the main TS boiler board.  All 

production units after approximately January 10, 2004 have a compatible control board.  If the zone 
controller installation is in a boiler manufactured prior to that date, call factory to review the requirements 
for a main controller board upgrade. 

 

ZONE CIRCULATORS 

 

The EE-5051 switching relay can be used to interface line voltage pumps with the boiler R and W control 
terminals, see drawing BH008.  This switching relay can be combined with the above zone controller 
board. 

 

ROOM THERMOSTAT PLACEMENT 

 

Fin tube radiation, fan coil, etc. – 

heat only wall t-stat, connected to operate zone valves (see previous 

section) or for single zone the t-stat is connected directly to Electro-Boiler R and W. 

 

Floor radiant

 – comfort and proper space heating response is a direct relationship to the thermostat type 

and the placement of the thermostat sensing bulb.  Typically an under floor heating system can be broken 
down into three categories. 

 

A.

 

Energy storage, water tubing is under the concrete or within the sand base

 

– the controlling thermostat must have a remote bulb, and this remote bulb must 
sense the concrete slab temperature (slab stat).  Coordinated with the concrete 
pour, install a ¾” PVC, minimum bend radius of 7 inches, and locate at 
approximately center (vertical) of the concrete slab.  The thermostat sensing 
bulb can later be pushed down this PVC conduit.  If the slab is already poured 
without conduit for slab stat, use electronic remote sensing thermostat such as 
Electro Industries’ 

ES-24-SRO or ES-24-C-RS

.  These devices only require a 

¼” hole drilled in the floor at some convenient location (preferably off a center 
wall, not within 2 feet of outside wall). 

B.

 

Floor covering, medium to high insulation 

– use slab stat as described in paragraph A above. 

C.

 

Quick response, hydronic tubing just under the concrete surface, no flooring material over the 
concrete

 – in this case, heated water can directly radiate into the room, a standard wall mount room 

thermostat is adequate.  Mount room thermostat on an inside wall similar to most heating systems. 

 

MULTIPLE BOILERS 

 

This boiler series now includes a method for automatically staging 
any number of parallel-plumbed boilers.  Order plug-in relay EB-C-
STG5. 
 
The thermostat is connected only to the first boiler, when all stages 
are on for more than 5 minutes, this new plug-in relay module turns 
on the next boiler (R and W), and a second EB-C-STG5 could be 
used to turn on the third, etc. 

 

Содержание EB-S-13

Страница 1: ...acity and flow changes may cause some internal timing overtemp conditions With the mixture of zones the zone controller ZTS option is highly recommended see page 2 This series is equipped for load management interrupt and can apply to standard baseboard radiation dual heat combinations under floor radiant wood boiler supplement etc ACCESSORIES Attached BL001 lists various accessory or option items...

Страница 2: ...Feature 4 Boiler Plumbing Kit Placement 4 Installation Requirements 4 Mechanical Installation Under Floor Radiant 6 Dual Heat 7 Electrical Hookup 8 Water Fill Procedure 9 Controller Setup 10 Operational Tips 10 Replacement Parts List 11 Troubleshooting Repair Helps 12 Sequence 12 Drawings Basic Mechanical BX501 Piping Install Kits BX502 Hookup BH501 Internal Wiring Schematic BS501 Boiler Accessori...

Страница 3: ...ed as hot boiler This will defeat the Electro Boiler Rewire as required standby boiler is turned on from the brown wires In the case of existing fossil fuel boiler conversions it is assumed the expansion tank valving air bleeder and circulation pump are in place in good operating condition and adequate for the overall system design In the case of new installation radiant floor or baseboard use sta...

Страница 4: ...the boiler is turned on via contact closure on R and W At least one zone must be open before turning on the primary pump Electro Boiler Do not design a system where the Electro Boiler is supposed to operate as a hot boiler based upon its outlet sensor without the primary pump circulating water minimum 2 GPM is required New improved feature the EB ZTS 1 zone controller priority zone now has the abi...

Страница 5: ...oil etc heat only wall t stat connected to operate zone valves see previous section or for single zone the t stat is connected directly to Electro Boiler R and W Floor radiant comfort and proper space heating response is a direct relationship to the thermostat type and the placement of the thermostat sensing bulb Typically an under floor heating system can be broken down into three categories A En...

Страница 6: ...k must be performed by trained qualified contractors or technicians Electro Industries Inc sponsors installation and service schools to assist the installer Visit our web site at electromn com for upcoming service schools WARNING ALL ELECTRICAL WIRING MUST BE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE AND LOCAL ELECTRIC CODES ORDINANCES AND REGULATIONS WARNING OBSERVE ELECTRIC POLARITY AND WIRING C...

Страница 7: ...staller must know this product well enough to instruct the end user on its safe use Safety is a matter of common sense a matter of thinking before acting Professional installers have training and experienced practices for handling electrical sheet metal and material handling processes Use them CLEARANCES MINIMUM CLEARANCE FROM COMBUSTIBLE SURFACES SUGGESTED MINIMUM SERVICE CLEARANCE BACK 0 INCH 0 ...

Страница 8: ...agm tank as provided in the plumbing kit or a basic empty tank where air is compressed at the tank top Inlet Temperature Gauge recommended to observe the operation of the system Air Vent install with the pressure relief valve as shown on drawing BX502 page 2 or part of the air eliminator shown on BX502 page 3 Inline Air separator this can be installed ahead of the pump with the expansion tank move...

Страница 9: ...T ports must be at the top The unit will not function properly with the vessel in a horizontal position NOTE Mount at least 20 inches above the floor to allow element removal and service at the bottom 5 Typically this unit is wall hung next to the existing boiler 6 Use the pipe fittings to install the safety relief valve and air vent Add the necessary piping to the safety relief valve so that wate...

Страница 10: ...e system pump controlled by these two terminal screws 4 Operating Thermostat two types can be used Connection is at the control board bottom Standard Mechanical connect to R and W bottom right Set thermostat internal heat anticipator to 0 2 Electro Stat ES 24 C RS or ES 24 SRO 3 wire connection required R to R W to W C to common The Electro Stat remote sensor can be extended as required This is a ...

Страница 11: ... user needs to make sure the pressure within the boiler loop does not exceed 30 PSI Careful control of the supply water ball valve opening can take care of this Also at steps 6 and 10 use caution to make sure the building water supply pressure does not spike the system 1 Connect the temporary household water supply source probably hose connection to the water supply connection input NOTE If water ...

Страница 12: ... the two pin shorting device is in the W position the pump is a direct function of R to W input When the two pin jumper is in the L position the pump is interrupted during a load control WARNING This shorting device must be in one of the two positions for the circulator pump to properly operate OPERATIONAL TIPS Heating Cycle 1 External R to W contact closure 2 Assume the load control receiver devi...

Страница 13: ...s the transformer secondary external items connected to R and the circuit board itself Replace with 2 amp fast blow AGC2 or equivalent Stat Heat Anticipator If it is a mechanical stat verify heat anticipator has been set at Ø 2 non zone system System Pressure The side press temp gauge should be at approximately 10 to 16 PSI at room temperature water and should not rise more than approximately 4 PS...

Страница 14: ...nside control board left side contains a E tab which can be used to directly step in the heating stages and in essence bypass the temperature sensing and control functions The E tab has the highest priority and overrides all temperature sensor functions In other words when jumpering from W to E all four stages are hard on Note Verify pump is operating prior to using the E terminal Since activating...

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ...1 J5 SB 4 3 2 STG STG STG STG 1 SW5 CALIB SENSOR TB1 J4 TEMP TEMP SENSOR RED ST OT COM BLUE BLUE LMC T STAT CABLE TB2 W TB2 R TB2 C 5 NO COM 4 PUMP 2 3 L1 L2 240VAC SOURCE POWER CIRCUIT BREAKER L1 2 120VAC CIRCUIT BREAKER NEUTRAL TB2 R TB2 C TB2 W L1 L2 L2 L1 L2 L1 5 COMMON REQUIRED FOR ELECTRO STAT RELAY CONTACT FOR PUMP 4 DRAWING SHOWN WITH OPTIONAL SINGLE FEED BUS APPLIED MUST ORDER SEPARATELY ...

Страница 20: ......

Страница 21: ...tem for Brand X boilers or dual EB R L E Series EB ZC 4 wiring and convenience interface isolated boiler end switch EB 5415A low cost 2 or 3 zones sheds one boiler stage Mini Boiler enhancement ZONE CONTROLLER SLAB STAT Sensing and controlling the system based upon radiant floor surface temperature or the concrete mass has very positive benefits Radiant floor air stat in the same area as a forced air...

Страница 22: ...es boilers come standard equipped with outlet temperature pressure gauge pressure relief safety valve and when applicable the WarmFloTM electronic control sensors These kits provide the additional components for easy installation 5585 Mini Boiler 10 kW TS Series 5586 TS Series Standard 5578 3 4 Pipe 5582 1 Pipe 5579 1 1 4 Pipe 120V 1 25 HP maintenance free wet rotor circulator Pump curve example 5...

Страница 23: ...ade by Electro Industries or its authorized representative Electro Industries will cover reasonable labor costs to repair defective product or product parts for ninety 90 days after installation TWENTY YEAR 20 LIMITED WARRANTY ON BOILER ELEMENTS AND VESSELS Electro Industries Inc warrants that the boiler elements and vessels of its products are free from defects in materials and workmanship throug...

Страница 24: ...ill be null and void 4 The purchaser shall have maintained the product in accordance with the manual that accompanies the unit Annually a qualified and licensed contractor must inspect the product to assure it is in proper working condition 5 All related heating components must be maintained in good operating condition 6 All lines must be checked to confirm that all condensation drains properly fr...

Отзывы: