background image

 

Electroair Acquisition Corp. 

IM EA-15000 

Page 4 of 10 

Revision 01 

Prepared by:  EAC 

02/04/2020 

EA-15000 Kit Description & Requirements 

EA-15000 System Description & Requirements: 

1.  This kit replaces the rotary key switch on aircraft with an two magnetos. 
2.  12V or 24V electrical system capable of 0.75A. 

 

Other items needed: 

1.  Basic tools and standard aircraft hardware required for mounting EA-15000 

Ignition/Starter Switch Panel. 

2.  Electrical tools for cutting, stripping, and terminating various wiring.  Also 

recommended is a good selection of cable ties for harness routing and tie-off, 
and a selection of shrink tubing for covering exposed electrical connections. 

 

EA-15000 Kit Contents 

EA-15000 Kit Contents: 

1.  ___EA-15000 Panel with Switches 
2.  ___Baggie with connectors and connecting hardware 
3.  ___USB Drive Containing System Documents (Installation Manual, STC, ICA) 
4.  ___Warranty registration** 

**USE THIS TO OBTAIN THE STC AUTHORIZATION LETTER**

 

 

Receiving and Acceptance Checking of EA-15000 Kit 

 

1.  Inspect the packaging for damage before acceptance from the freight carrier.  If 

damaged, refuse the package. 

2.  Open the package. 
3.  Inventory the contents of the package to the content listing of the package. 
4.  Are all of the materials there?  If yes, proceed to step 5.  If no, proceed to step 9. 
5.  Inspect the switches for broken plastic.   
6.  Inspect the panel for bends 
7.  Are all materials acceptable? 
8.  If yes, proceed with installation. 
9.  If no, contact the factory.  Have the serial number of the kit available when 

contacting.  (factory 248-674-3433 or 

[email protected]

 

If possible, store parts in original packaging when not in use.  If not possible, wrap parts 
in cushioning material and place in one location.  Review above prior to reinstallation. 
 
For latest copies of documentation, refer to 

www.electroair.net

  Approved Model Listing (AML) 

  Approved Flight Manual 

Supplement (AFMS) 

  Instructions for Continued 

Airworthiness (ICA) 

  Installation Manual (IM) 

  Supplemental Type Certificate 

(STC) 

  Trouble Shooting Instructions 

(TSI)

Содержание EA-15000

Страница 1: ...evision 01 Prepared by EAC 02 04 2020 Electroair Acquisition Corp 5097 Williams Lake Road Waterford MI 48329 U S A Phone 248 674 3433 Fax 248 674 4231 Email sales electroair net EA 15000 Installation...

Страница 2: ...STATEMENTS 5 INSTALLATION OF EA 15000 6 GLOSSARY AND ABBREVIATIONS 10 Table of Figures Figure 1 Configuration A Overall Dimensions 6 Figure 2 Configuration B Overall Dimensions 6 Figure 3 Configurati...

Страница 3: ...nds reading through this entire installation procedure before installing the Electroair Ignition Starter Switch Panel to your aircraft Make sure that any questions are answered before the actual insta...

Страница 4: ...TO OBTAIN THE STC AUTHORIZATION LETTER Receiving and Acceptance Checking of EA 15000 Kit 1 Inspect the packaging for damage before acceptance from the freight carrier If damaged refuse the package 2...

Страница 5: ...and either a poor performing EIS or the possibility of damaging equipment Prior to turning on bus power verify the wiring Please call Electroair with any questions sales electroair net or 248 674 3433...

Страница 6: ...ations Determine the proper location for the panel Determine the most appropriate mounting method Overall dimensions are provided in Figure 1 and Figure 2 Cutout dimensions are provided in Figure 3 an...

Страница 7: ...ry key switch location plug the hole left by removing the rotary key switch as necessary 3 Set up Installation of p n EA 15000 Ignition Starter Switch Panel Review the leads corresponding to the locat...

Страница 8: ...ectrical connectors are tight on switch connections Ensure wires will not pull out of any electrical connections Left Mag Switch o Connect ground to GND o Connect the P Lead from the Left Magneto to P...

Страница 9: ...during starting Start the aircraft per the AFMS and perform a ground run up o Check for proper starter function o Check for proper RPM drop on Left Magneto o Check for proper RPM drop on Right Magneto...

Страница 10: ...r Wheel EIS Electronic Ignition System FAA Federal Aviation Administration Ignition Timing is the process of setting the angle relative to piston position and crankshaft angular velocity that a spark...

Отзывы: