background image

All disclosures, notices and warranty conditions are being written on EKWB web page.  Please check terms of use.   

          Revision 1.0. Published on October 10

th

 2017 

Place thermal pads on PCB as shown on the picture below. 

PLEASE  REMOVE  THE  PROTECTIVE  FOIL  FROM  BOTH  SIDES  OF  THE  THERMAL 
PADS PRIOR TO INSTALLATION!

 

 

STEP 5: PLACING THERMAL PADS 

STEP 6:  PLACING A BLOCK ON TO THE MOTHERBOARD

 

 

Place the

 

EK-FB ASUS ROG ZE Monoblock series water block gently to the motherboard 

or vice versa (as shown on photo below). Make sure that mounting holes are aligned. 

Place it on factory installed washers on the motherboard (MOSFET area).

  

 

STEP 7.1:  ATTACHING A BLOCK ON TO THE MOTHERBOARD 

STEP 7.2:  ATTACHING A BLOCK ON TO THE MOTHERBOARD 

Prior  to  fastening  the  screws  please  make  sure  the  mounting  holes  on  the 

motherboard’s circuit board are aligned with the water block.

 Secure top 4 (four) 

nickel screws with enclosed 2,5mm Allen key. Tighten screws diagonally and evenly 
till the end of the thread. Do not use excessive force when tightening the screws! 

Prior  to  fastening  the  screws  please  make  sure  the  mounting  holes  on  the 

motherboard’s circuit board 

are aligned with the water block. Use 2 (two) M2,5x7 AX1 

screws with original backplate. Tighten the screws evenly. Do not use excessive force 

when tightening the screws! Now you can reinstall factory plastic I/O cover.

  

 

STEP 8:  CONNECTING THE D-RGB LED STRIP (optional)

 

Plug the 4-pin connector from Monoblock D-RGB LED strip to the ADD HEADER on 

the motherboard. Please ensure that the arrow indicated on the connector is plugged 
into the +5V line as indicated on your motherboard. Failure to do so will damage 

your motherboard or LED strip. 

 

For the  EK-FB ASUS  ROG  ZE  Monoblock  series water  block to operate properly the 

G1/4 port nearest to the right edge of the water block 

MUST BE USED AS THE INLET 

PORT

. EK recommends the use of EK-ACF fittings. When using fittings other than EK-

ACF series please use hose clamps or appropriate substitute to secure the tubing to 
the  barb.

 

  The  use  of  biocide  containing  and  corrosion  inhibiting  coolant  is  always 

recommended for any liquid cooling system.

 

       

REQUIRED TOOLS AND MOUNTING SCREWS: 

 scissors  

 philips screwdriver     

 Allen key 

 

 

 

M2.5x7 screws 

Tubing 

IMPORTANT: USE 
THIS OPENING AS 
AN INLET PORT! 

Place  1mm  thermal  pads  in 
large  strip  over  marked  area 
and make sure all mosfet chips 
and inductor coils are covered.

 

 

Отзывы: