manualshive.com logo in svg
background image

Assembly Instruction

STC 160

Содержание GSS STC 160

Страница 1: ...Assembly Instruction STC 160 ...

Страница 2: ... potential equalisation PE 11 4 4 Installing F terminals 12 4 5 Installing an additional fan 12 4 6 Mounting 13 Wall mounting 14 Upright mounting 15 Mounting inside a 19 cabinet 16 5 Installing modules 17 6 Connecting the head end station 18 6 1 Potential equalisation PE 18 6 2 Mains connection 18 6 3 LNB Power supply connections 19 6 4 RF connections 19 7 Settings 20 7 1 Contrast of the display 2...

Страница 3: ...station it is not admissible to mount them one upon the other without using thermic precautions e g permanently air recirculation ventilation heat deflectors etc Do not install the device in cabinets or recesses which are not ventilated If additional fans are to be used to circulate the air ensure that the system will be shut down disconnected from mains should any one of the fans fail In case of ...

Страница 4: ...vice and the modules Electronic devices should never be disposed of in the household rubbish In accordance with directive 2002 96 EC of the European Parliament and the European Council from January 27 2003 which addresses old electronic and electrical devices such devices must be disposed of at a designated collection facility At the end of its service life please take your device to one of these ...

Страница 5: ...ils the guidelines and standards for CE labelling page 24 Unless otherwise noted all values are specified as typical General Slots unoccupied 8 modules 8 add on modules Permissible ambient temperature 0 C 50 C Dimensions W x H x D cm 44 3 19 x 35 5 8 HU x 22 8 Weight approx 20 kg fully equipped LNB power supply 12 V max 800 mA short circuit proof multi fused Mains unit Mains voltage 220 240V 50 60...

Страница 6: ...ents e g LNB connected upstream All RF output signals from the modules are combined via the inputs of a retro fitted active RF output collector and prepared for distribution through the RF output socket When the head end station is shipped from the factory the default setting for the control voltage for a RF output collector is maximum If necessary please set the master output level to the value r...

Страница 7: ...Locking screws incl with delivery in a separate package 2 Fastening screws 3 2 Front view without front cover 3 2 1 4 Fig 2 1 Knock outs for upgrading a RF output collector 2 Knock outs for the SAT IF input distributors 3 Control panel 4 Knock outs for F terminals ...

Страница 8: ... 4 5 3 2 1 7 Fig 4 1 Power cord socket 2 Main power switch 3 Earth connection terminal 4 SAT IF inputs 5 Knock outs for additional F terminals 6 Knock out for the optional installation of the earth connection terminal 7 RF output ...

Страница 9: ...n to adjust the contrast of the display 3 Mode indicator 4 To adjust values and functions 5 Moves the cursor adjusts functions 6 Stores the programmed data 7 To switch to the next menu 8 9 pin SUB D socket for updating the operating software of the modules and the head end station ...

Страница 10: ... for initial assembly Slide the front cover upwards and remove it from the head end station 4 2 Remove base plate 1 2 2 2 Fig 7 Remove the locking screw 1 Remove the fastening screws 2 If applicable unscrew the nuts of retrofitted F terminals not required for initial assembly Push the base plate in direction of the arrow and remove it ...

Страница 11: ...8 1 2 Fig 8 Dismount the PE connection terminal so that it can be moved Mount the PE connection terminal according to fig 9 in position 2 as shown in fig 8 Housing Fig 9 Caution Tighten the nut until the teeth on the lock washer have penetrated the exterior coating and a good connection is made between the housing and PE connec tion terminal ...

Страница 12: ...penetrated the exterior coating and a good connection is made between the housing and F terminals 4 5 Installing an additional fan If environmental conditions require the use of an additional fan one can be screwed to the inside of the base plate hole spacing 82 x 82 mm 82 mm 82 mm Fig 11 Remove base plate page 10 Mount the fan 12 V 1 A max in position 1 or 2 fig 11 to the inside of the base plate...

Страница 13: ...he minimum distance requirements 500 mm above below and 75 mm behind the device at wall mounting 500 mm above and 75 mm be low behind the device at upright mounting 200 mm above below and 100 mm behind the device at mounting in a 19 cabinet will be met If mounting to a wall or on a shelf ensure that The wall or the shelf can support the weight of the head end station There is adequate air conditio...

Страница 14: ...the back edge of the mounting bracket is approx 75 mm Screw in the 6 thread forming countersunk screws 2 that were supplied Attach the mounting bracket to the other side of the housing in the same way Insert wall plugs suitable for the wall properties into the wall so that they correspond to the dimensions in the following illustration fig 14 140 mm 465 mm Fig 14 Mount the head end station and scr...

Страница 15: ...n the head end station housing and snap it into place The distance between the underside of the head end station and the lower edge of the mounting bracket is approx 75 mm Screw in the 6 thread forming countersunk screws 2 that were supplied Attach the mounting bracket to the other side of the housing in the same manner ...

Страница 16: ... nuts into the frame of the rack system according to the distance of the holes 5 in the mounting bracket 3 approx 190 mm Connect the head end station according to chapter 6 page 18 Put the head end station onto the support elements push it into the 19 cabinet Fasten the head end station to the prestole nuts of the 19 cabinet using the holes 5 in the mounting brackets 3 and appropriate screws To av...

Страница 17: ...e housing The shorter grooves without a contact strip on the board at the rear wall of the housing are for add on modules only Open the locking device 1 in the direction of the arrow fig 17 1 Fig 17 1 2 3 Fig 18 Insert a module in grooves 1 and 2 of an open slot fig 18 and gently slide it into the head end station until it makes contact with the board on the rear wall After installing a module clo...

Страница 18: ... customer using the PE wire 6 2 Mains connection Never operate the device without a protective earth connection earth connec tion to the device and potential equalisation To maintain compliance with current EMC regulations electromagnetic com patibility it is necessary to route the power cord through the supplied ferrite sleeve Open the ferrite sleeve Make a loop in the power cord and lay the loop...

Страница 19: ...current EMC regulations it is necessary to connect the lines leading in and out of the head end station using F terminals Note The F terminal at the rear panel are intended to use for RF input and RF output The following connection example shows a possible connection scheme Connect the SAT IF cables coming from the LNBs to the relevant F terminals fig 23 4 4 6 4 5 3 2 1 7 Fig 22 ...

Страница 20: ... collector and adjust it ac cordingly based on the requirements of the cable system Afterwards set the standard of the output signal required Set a 4 digit PIN in menu PIN to protect the control panel from unauthorized access Setting the output level of a retrofitted RF output collector Connect the RF outputs of the modulators to the RF inputs of the RF output collector Connect the antenna test re...

Страница 21: ...tage for a retrofittable active output collector is set Press the button The Standard of the output signal NORM menu is activated Setting the standard of the output signal SETUP PAL BG NORM Using the buttons set the output standard as required for the cable system Here e g you can set the head end station to PAL D K standard for using OIRT modeles Always all modulator modules are set Mixed operati...

Страница 22: ...red ENTER PIN 0000 The protection is active again after each switch on and also 5 min utes after the last operation The PIN 0000 deactivates the PIN query Press the button The Store data MEMORY menu is activated A CANCEL SETUP S STORE MEMORY S M All programmed data is saved by pressing the button You will be re turned to the menu item Select module channel strip By pressing the button you will be ...

Страница 23: ...anner width 11 mm 1 2 2 2 Fig 26 Position the breakthroughs in the base plate above the fastening screws 2 fig 26 Push the base plate in direction of the arrow and lock it with the locking screw 1 fig 26 Tighten the fastening screws 2 Tighten the nuts of retrofitted F terminals if applicable Hang the front cover on the fastening screws 2 page 10 fig 6 Secure the front cover using the 4 locking scr...

Страница 24: ... Straße 43 D 90471 Nuremberg Phone 49 0 911 633 240 0 Fax 49 0 911 633 240 98 www gss de en info gss de Service Phone 49 0 911 633 240 90 service gss de Alterations reserved Technical data E O E by GSS Grundig Systems GmbH V11 003 2019 ...

Отзывы: