Initial start-up
Check if there is water on the system and if the system has been ventilated. The
power supply for the boiler
MUST
be connected to earth.
Now connect the power and the display will immediately lighten up with the
Ekopower logo and after app. 5 sec. a grapich picture will emerge on the screen.
Press ”
INFO
” for a start and check that it is the same type of Ekoheat which is
mentioned in the control as just have been installed. (Look for more info under
Fault Finding
, if it is the wrong size).
Now adjust the watch and the date. This is done by pressing
Menu/user
settings/watch and date.
Press on the number which you would like to insert and
press OK when the number has been inserted.
Check the time of moving of the ashplate.
Press Menu/user settings/clean now.
Choose 1 and wait for 80 seconds. (The burner must be mounted in the boiler while
this is done). When the time has elapsed, take out the burner and the bottom plate
must then be at the same line as the back plate of the burner. If this is not the case,
then correct the time in
Menu/serviceman/movement back plate
up or down by 1
second at a time.
Calibration of the auger
must
be done before start-up of the boiler, as it then will
not obtain the ultimate combustion and thus have a lower efficiency. Press
Menu/user settings/adjust/calibration auger
. Now start with demounting of the
flexible tube on the outlet. Then mount a bag on the outlet of the external auger
and then press ”Start” under ”Manual operation”. Let the auger run for minimum
15 minutes and then put the wood pellets in the hopper again.
Then mount the bag on the outlet of the auger again and press ”Start” under
”Dosing test”. The control now starts to count down from 200 and has finished
when it reaches 0. Then weigh the bag, and the weight of the pellets is inserted
under “Amount by 200 dosings” which by standard is 1450 g.
This calibration
must
be repeated again after passing through 200 kg of wood
pellets or at the latest when the boiler has been running for 14 days. This must
also be done again if the magazine has been emptied, when you change the size of
wood pellets or the mark of wood pellets.
Now press “Finish” and mount the flexible tube on the outlet of the auger. Mount
the front gate of the boiler again. The boiler is now ready for the initial start-up,
then press “Start”.
If the boiler does not start after this, then look for more info under Fault Finding.