Initial start-up

 

Check if there is water on the system and if the system has been ventilated. The 
power supply for the boiler 

MUST

 be connected to earth. 

 

 

Now connect the power and the display will immediately lighten up with the 
Ekopower logo and after app. 5 sec. a grapich picture will emerge on the screen. 
Press ”

INFO

” for a start and check that it is the same type of Ekoheat which is 

mentioned in the control as just have been installed. (Look for more info under 

Fault Finding

, if it is the wrong size).  

 

Now  adjust  the  watch  and  the  date.  This  is  done  by  pressing 

Menu/user 

settings/watch and date.

 Press on the  number which you would like  to insert and 

press OK when the number has been inserted. 

 

 

Check the time of moving of the ashplate. 

Press Menu/user settings/clean now. 

Choose 1 and wait for 80 seconds. (The burner must be mounted in the boiler while 
this is done). When the time has elapsed, take out the burner and the bottom plate 
must then be at the same line as the back plate of the burner. If this is not the case, 
then correct the time in 

Menu/serviceman/movement back plate

 up or down by 1 

second at a time.  
 
Calibration of the auger 

must

 be done before start-up of the boiler, as it then will 

not obtain the ultimate combustion and thus have a lower efficiency. Press 

Menu/user settings/adjust/calibration auger

. Now start with demounting of the 

flexible tube on the outlet. Then mount a bag on the outlet of the external auger 
and then press ”Start” under ”Manual operation”. Let the auger run for minimum 
15 minutes and then put the wood pellets in the hopper again.  
Then mount the bag on the outlet of the auger again and press ”Start” under 
”Dosing test”. The control now starts to count down from 200 and has finished 
when it reaches 0. Then weigh the bag, and the weight of the pellets is inserted 
under “Amount by 200 dosings” which by standard is 1450 g. 

 

This calibration 

must

 be repeated again after passing through 200 kg of wood 

pellets or at the latest when the boiler has been running for 14 days. This must 
also be done again if the magazine has been emptied, when you change the size of 
wood pellets or the mark of wood pellets.  
Now press “Finish” and mount the flexible tube on the outlet of the auger. Mount 
the front gate of the boiler again. The boiler is now ready for the initial start-up, 
then press “Start”. 
 

If  the boiler does not start after this, then look for more info under Fault Finding.  

 

 

 
 
 
 
 
 
 

 

På linie med 
bagplade 

 

 

 

 

Содержание EkoHeat 1500

Страница 1: ...are up dating Page 17 Technical specifications Page 18 Warranty Page 19 CE Marking Page 20 23 Test of approval Page 24 Marks of approval The pellet boiler from Ekopower has been tested by Dansk Teknol...

Страница 2: ...not be more than 0 5 m long and must always be rising If the flue pipe extend more than 0 5 meter or if bendings are mounted then it must always be insulated The draught in the chimney must be stable...

Страница 3: ...a time Calibration of the auger must be done before start up of the boiler as it then will not obtain the ultimate combustion and thus have a lower efficiency Press Menu user settings adjust calibrat...

Страница 4: ...Boiler temperature 40 80 60 Here you set the wanted boiler temperature Should not be below 60 and always 10 higher than the set point of the shunt valve Fuel 0 Kilogram pellets which are added per hou...

Страница 5: ...r is needed The temperature of this must be set under VVB priority Summer operation must be activated to do this and this can be checked by the appearance of a sun in the graphics on the front page De...

Страница 6: ...this will run when the temperature of the boiler is above set point and stops when this is below again Ekopower recommends to set pump stop at 55 and the boiler temperature at 65 by engagement of summ...

Страница 7: ...ill destroy the thread for the spindle Efficiency for flue suction 0 100 100 Here you can adjust how much air need to be added in proportion to efficiency in percent You can adjust per 10 These number...

Страница 8: ...oiler temperature rises before the boiler stops and waits for a temperature drop The boiler starts again when the boiler temperature is below 45 degrees Max efficiency 20 100 60 The boiler can be set...

Страница 9: ...ifferent flags as a symbol of which language you want on the boiler Menu Self Testing Here you can choose which type of boiler you have 900 1500 2500 4000 Test boiler is only for Ekopower authorised t...

Страница 10: ...of wood pellets The ash can be used in the garden as compost The burner According to need take out the burner by loosening the two handles on each side of the burner The air vents which are placed in...

Страница 11: ...ensor and the ash plate can be taken out and the slag can be removed Photo sensor Once a month check the photo sensor for dirt on the eye Pull it carefully out of its holder and clean the glass part w...

Страница 12: ...Page 12 Electrical chart of the control...

Страница 13: ...sive pipe pocket on the return water Draught stabilizer To be used by too much draught or by fluctuating draught to give a more even draught in the chimney Connection kit A connection kit is used betw...

Страница 14: ...gnition error The amount of pellets for ignition is too small or too big The calibration might be incorrect The boiler must be calibrated If this does not help adjust the amount of pellets for ignitio...

Страница 15: ...lation of slag on the ash plate Clean the ash plate for slag The screw stick is not greased with aluminium paste or the screw block is worn out Grease the screw stick with aluminium paste Change the s...

Страница 16: ...Then carefully lift out the controller 3 The USB flash drive is inserted in the USB port app on the middle of the printed circuit board 4 Now press MENU in the display 5 Then press FITTERS SETTINGS an...

Страница 17: ...s 74 liters 104 liters Min chimney draught 0 1 mBar 0 1 mBar 0 1 mBar 0 1 mBar Electrical connection 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt Fue...

Страница 18: ...the warranty D Ekopower reserve the right to send an external service company This can only be done by Ekopower The installer dealer who have no written agreement from Ekopower will not get any work...

Страница 19: ...t EK OHEAT 900 EKOHEAT 1500 EK OHEAT 2500 EK OHEAT 4000 M tdi ine DndRie 3 1 CE stuvl 1 EN 3ffi 5 ffiM ng oo ilm fir solii mls hind M Ld i llltDin i lti cilly stDhd rom naJ hei 11 Cl llp1i a I to 300h...

Страница 20: ...Page 20...

Страница 21: ...Page 21...

Страница 22: ...Page 22...

Страница 23: ...Page 23 We do hope that you have got a good profit from this manual Should you have further questions please do not hesitate to contact us at post ekopower dk...

Отзывы: