background image

Page  18 

 

 

 

Warranty Ekopower ApS.

 

Ekopower ApS provides warranty on all products according to the Sale of Goods Act. 

Ekopower ApS provides 

3 years of warranty

 on all products under the following assumptions and exceptions. 

1.

 

Complaints

 

A.

 

The warranty given by Ekopower ApS, does not deprive the consumer access to do any liability, after 
the law, applicable to the dealer, who has supplied the product to the consumer.  
 

B.

 

To uptain the extendend warranty given by Ekopower, the consumer must always contact Ekopower 
directly on phone: +45 63407050 or at

 [email protected].

 Outside the normal opening hours of 

Ekopower, this is done by sending an e-mail t[email protected] 

2.

 

What is covered under the warranty?

 

A.

 

The warranty is only valid for the products delivered by Ekopower. 

B.

 

The warranty covers the following from the date of installation:

 

I.

 

Costs for changing and repair the first 12 months. 

II.

 

Spare parts for 3 years. Except from this are the electrical igniter, photo sensor and the burner pipe. 

III.

 

Warranty of corrosion for 5 years, if correct shunt valve is mounted. 

C.

 

Only service staff from Ekopower can decide if it is a matter of complaint under the warranty. 

D.

 

Ekopower reserve the right to send an external service company. This can only be done by Ekopower. 
The installer / dealer, who have no written agreement from Ekopower, will not get any work of 
warranty covered on products from Ekopower.  

E.

 

Costs for demounting/mounting of household goods or similar will be invoiced directly to the 
customer, if this is necessary for repairing the complaint on the product from Ekopower. 

3.

 

Warranty conditions

 



 

It is a condition for the warranty that the warranty certificate is filled in and registered at Ekopower 
no later than 14 days after the installation. 



 

The consumer must check the product immediately upon receipt. Ekopower must be notified on any 
damages or defects as soon as possible, and within 8 days. 



 

The product must be properly installed, that means according to current standards at the time of 
installation and the included user manual. 

4.

 

Where is the warranty valid?

 

A.

 

The warranty is only valid in Denmark, except from the Faroe Islands & Greenland. 

5.

 

Damages caused by the product

 

A.

 

Ekopower ApS is responsible for damages caused by the product according to the Product Liability. 

B.

 

Damages due to leaking water is not covered. 

 
 

Best regards

         

Dan Elkjær   

Director 

Falstervej 28 

Dk-5500 Middelfart  Tlf: 

+45 63 40 70 50 

Fax +45 63 40 70 54 

CVR nr. VAT no. 33 35 55 48 

www.ekopower.eu 

[email protected] 

Содержание EkoHeat 1500

Страница 1: ...are up dating Page 17 Technical specifications Page 18 Warranty Page 19 CE Marking Page 20 23 Test of approval Page 24 Marks of approval The pellet boiler from Ekopower has been tested by Dansk Teknol...

Страница 2: ...not be more than 0 5 m long and must always be rising If the flue pipe extend more than 0 5 meter or if bendings are mounted then it must always be insulated The draught in the chimney must be stable...

Страница 3: ...a time Calibration of the auger must be done before start up of the boiler as it then will not obtain the ultimate combustion and thus have a lower efficiency Press Menu user settings adjust calibrat...

Страница 4: ...Boiler temperature 40 80 60 Here you set the wanted boiler temperature Should not be below 60 and always 10 higher than the set point of the shunt valve Fuel 0 Kilogram pellets which are added per hou...

Страница 5: ...r is needed The temperature of this must be set under VVB priority Summer operation must be activated to do this and this can be checked by the appearance of a sun in the graphics on the front page De...

Страница 6: ...this will run when the temperature of the boiler is above set point and stops when this is below again Ekopower recommends to set pump stop at 55 and the boiler temperature at 65 by engagement of summ...

Страница 7: ...ill destroy the thread for the spindle Efficiency for flue suction 0 100 100 Here you can adjust how much air need to be added in proportion to efficiency in percent You can adjust per 10 These number...

Страница 8: ...oiler temperature rises before the boiler stops and waits for a temperature drop The boiler starts again when the boiler temperature is below 45 degrees Max efficiency 20 100 60 The boiler can be set...

Страница 9: ...ifferent flags as a symbol of which language you want on the boiler Menu Self Testing Here you can choose which type of boiler you have 900 1500 2500 4000 Test boiler is only for Ekopower authorised t...

Страница 10: ...of wood pellets The ash can be used in the garden as compost The burner According to need take out the burner by loosening the two handles on each side of the burner The air vents which are placed in...

Страница 11: ...ensor and the ash plate can be taken out and the slag can be removed Photo sensor Once a month check the photo sensor for dirt on the eye Pull it carefully out of its holder and clean the glass part w...

Страница 12: ...Page 12 Electrical chart of the control...

Страница 13: ...sive pipe pocket on the return water Draught stabilizer To be used by too much draught or by fluctuating draught to give a more even draught in the chimney Connection kit A connection kit is used betw...

Страница 14: ...gnition error The amount of pellets for ignition is too small or too big The calibration might be incorrect The boiler must be calibrated If this does not help adjust the amount of pellets for ignitio...

Страница 15: ...lation of slag on the ash plate Clean the ash plate for slag The screw stick is not greased with aluminium paste or the screw block is worn out Grease the screw stick with aluminium paste Change the s...

Страница 16: ...Then carefully lift out the controller 3 The USB flash drive is inserted in the USB port app on the middle of the printed circuit board 4 Now press MENU in the display 5 Then press FITTERS SETTINGS an...

Страница 17: ...s 74 liters 104 liters Min chimney draught 0 1 mBar 0 1 mBar 0 1 mBar 0 1 mBar Electrical connection 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt Fue...

Страница 18: ...the warranty D Ekopower reserve the right to send an external service company This can only be done by Ekopower The installer dealer who have no written agreement from Ekopower will not get any work...

Страница 19: ...t EK OHEAT 900 EKOHEAT 1500 EK OHEAT 2500 EK OHEAT 4000 M tdi ine DndRie 3 1 CE stuvl 1 EN 3ffi 5 ffiM ng oo ilm fir solii mls hind M Ld i llltDin i lti cilly stDhd rom naJ hei 11 Cl llp1i a I to 300h...

Страница 20: ...Page 20...

Страница 21: ...Page 21...

Страница 22: ...Page 22...

Страница 23: ...Page 23 We do hope that you have got a good profit from this manual Should you have further questions please do not hesitate to contact us at post ekopower dk...

Отзывы: