INSTALLATION
NP-DK50 2x4VR 110-AD-A-1_09-2020
30
09/2020
13. COMMISSIONING
Make sure all transport stabilizers were removed.
Check that all compressed air hose connections are correct
Check correct connection to the mains (see chap. 12).
Check the circuit breaker position, it must be in the “I” position. If the main switch (2) is in the “0”
position, tur
n it to the “I” position. (Fig. 20).
For cabinet-mounted compressors, turn the main switch (4) on the front side of the cabinet into
the "I" position; a green indicator indicates the equipment is in operation. (Fig. 20).
Check connection of the cabinet connector to the compressor (Fig. 18)
Check connection of the cabinet manometer hose to the pneumatic block of the compressor (Fig.
Check to ensure the compressed air connection between the compressor and dryer is correct.
Check to ensure the hose from the automatic condensate drain is connected to the collection
vessel.
Check the connection of the dryer control and power signal wiring from the compressor. (Fig.
The compressor is not equipped with a backup power supply.
Содержание DK50 2x4VR/110/M
Страница 1: ...DK50 2x4VR 110 User manual Benutzerhandbuch N vod na pou itie...
Страница 2: ......
Страница 4: ...CONTENTS 4 INHALT 57 OBSAH 111...
Страница 14: ...PRODUCT DESCRIPTION NP DK50 2x4VR 110 AD A 1_09 2020 14 09 2020 Fig 2 Adsorption dryer...
Страница 15: ...PRODUCT DESCRIPTION 09 2020 15 NP DK50 2x4VR 110 AD A 1_09 2020 Fig 3 Cabinet...
Страница 66: ...PRODUKTBESCHREIBUNG NP DK50 2x4VR 110 AD A 1_09 2020 66 09 2020 Abb 2 Adsorptionstrockner...
Страница 67: ...PRODUKTBESCHREIBUNG 09 2020 67 NP DK50 2x4VR 110 AD A 1_09 2020 Abb 3 Geh use...
Страница 119: ...POPIS V ROBKU 09 2020 119 NP DK50 2x4VR 110 AD A 1_09 2020 Obr 1 DK50 2x4VR 110 M Kompresor s adsorp n m su i om vzduchu...
Страница 120: ...POPIS V ROBKU NP DK50 2x4VR 110 AD A 1_09 2020 120 09 2020 Obr 2 Adsorp n su i...
Страница 121: ...POPIS V ROBKU 09 2020 121 NP DK50 2x4VR 110 AD A 1_09 2020 Obr 3 Skrinka...
Страница 166: ......
Страница 167: ......